My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:22:44 PM
Creation date
11/7/2018 5:51:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\4075\PR0231667\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> S. SECONDARY PIPE TESTING. <br /> Test Method Developed By: X Piping Manufacturer Industry Standard L Professional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 120' Approx. 130' <br /> Product Stored: Regular 87 Super 91 <br /> Method and location of Test boot at STP Test boot at STP o <br /> piping-run isolation: Piping Sump#1 Piping,Sump#2 <br /> Wait time between applying 5 Minutes 5 Minutes. NTAL HEALTH <br /> pressure and startingtest: ON <br /> Test Start Time: 9:27 9:32 DEP <br /> Initial Reading(RZ): 3 Psi 3 Psi <br /> Test End Time: 10:27 10:32 <br /> Final Reading(RF): 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No loss in Psi No loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.