My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1987 INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
INSTALL 1987 INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:55 PM
Creation date
11/7/2018 6:28:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987 INSTALL
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\1987 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION 2A <br />ARTICLE 3, SECTION 2633/2634 <br />MOTOR VEHICLE FUELS ONLY <br />CONSTRUCTION <br />.o <br />,Requirements: <br />`U Approved tank construction material <br />$/ Leak interception and detection system which complies with Article 3, <br />Section 2631(c). <br />Membrane liners must comply with Article 3, Section 2633(e), (1), (2), <br />(3), (4),( 5) and are only allowed for piping systems (Department Policy) <br />Demonstrate that the leak interception and detection systems protects <br />ground water from contamination (Article 3, Section 2633(f), (1), (2), (3), <br />j (4), (5), (6), (7)• <br />fj Pressurized piping systems must be installed with a leak detector that is <br />capable of automatically shutting off the product pumps. <br />1. Any single wall component "tank or piping" requires daily inventory <br />reconcilliation and annual precision tests as part of the monitoring <br />program. <br />Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br />Standards. <br />/G., Before use - the tank(s) and system(s) must be tested in accordance to <br />NFPA 329. <br />iQrovide soil profile of vadose zone if membrane liners are used. <br />MONITORING, <br />OPTION 2B <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />Requirements (leak interception and detection system(s)). <br />A. Floor must be constructed on a firm base and sloped to a collection sump. <br />B. Access casings must be installed in accordance to Article 3, Section <br />2634 (c) 0 thru 6), (d) (1). <br />C. Submit written monitoring and response plan as stated in Article 3, <br />Section 2634 (d) (1-3), 2634(e) (1-5). <br />D. Hard wiring of electronic monitoring systems is required. <br />E. Provide manufacturer's written installation instructions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.