My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2002 INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
INSTALL 2002 INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:57 PM
Creation date
11/7/2018 6:28:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 INSTALL
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\2002 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. PLAN REVIEW AND OPERATING PERMIT FEES \� <br /> a. New facility plan review fee of$696.00 (8 hour minimum per facility), $500.00 facility fee <br /> (includes one tank), $125.00 per tank after the first tank, plus $8.00 state surcharge fee per <br /> tank is due at time of plan submittal plus $18.50 per site state surcharge. <br /> b. New installation of an additional tank at an existing facility is $696.00 plan review fee (8 hour <br /> minimum per facility) plus $500.00 facility (includes one tank), $125 per new tank after first <br /> tank, and $8.00 per new tank state surcharge fee. <br /> C. It should be noted that a $696.00 plan review check fee required for each submittal allows for <br /> up to eight (8) hours of staff review and/or inspection time. Additional time spent on plan <br /> review, meetings, inspections, phone or office consultations will be billed to the applicant at a <br /> rate of$87.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS-EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with a checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date if staff is <br /> available to perform the review. <br /> 3. PLAN REVIEW GUIDELINES <br /> a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br /> drawings to PHS-EHD. <br /> b. A copy of the California UST Regulations may be obtained from the California State Water <br /> Resources Control Board at (916) 227-4303. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br /> Air Pollution Control District, the County/City Building Department and the Fire District in <br /> your respective area. <br /> d. A minimum of 3 inspections will be conducted on the UST system installation. A $87 per <br /> hour inspection fee shall be charged for additional inspections or reinspection as required. <br /> (See required inspections below) <br /> e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br /> reported to and approved by PHS-EHD prior to installation. <br /> f. The application for installation of underground tanks is only valid for the calendar year in <br /> which it has been issued. A permit may be extended into the next calendar year if a letter is <br /> sent to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. A <br /> one time, one year extension may be granted by PHS-EHD upon receipt of this letter. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.