Laserfiche WebLink
UST SYSTEM DRAVINO IMrORMATiON <br /> 1 Thnee complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed), <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. _ _ Plot plan to show location of tanks and It associated piping. <br /> G. Striker plates or drop tube-Mounted bottom protectors illustrated below all accessible openings. <br /> 5, Tank cross sectional diagram. <br /> 5. Detail of tank, associated piping, excavation and cover. <br /> _ Tank(,) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) L 2635) <br /> 6. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> T9. At the installation site, prior to installation, a tightness test shall be performed on both primary (1') end <br /> secondary (2) containment systems before covering. (Section 2635 (a) (3) L Ml <br /> 11 __ lark intrgr ity tett required upon completinn of installation with tank in operating condition. Test results to be <br /> wbx111ed tllree tly ea elle-9114 from the t.mtine company or owner of facility, (Health L 9dety Clad-, nivielen an, <br /> Chapter 6.7, Section 25291 (h)) <br /> 12. TANK COMPOS IT 100 _ <br /> TANK. N N N M tl N <br /> CAPAUIY /�I_ <br /> MANUFACTURER._____ M CC�e /1C t (�'t <br /> COMPOSITION r a S ,5 �' <br /> MODEL <br /> GRJpUCT ri<SC�L F' dL <br /> CORPOSIUN PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> HAVOC / /ry�� 1 ' D <br /> 15- TANK(s) TO SE INSTALLED ¢,, I y,VV 0I-4 S� (A �� \tf�l1 IZ C' _ �(�lU� 1�`�Q V� <br /> A. Steel-clad with fiberglass reinforced plastic cl tings, composites, or equivalent m -mets is eat rior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soup bubble test prior to installation. <br /> (2) Vacuum applied to Interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)) <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> .etc.). <br /> (1) Fielo installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />