Laserfiche WebLink
19. piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)1, or <br /> (e) vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)) <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> XPrimary piping in contact with hazardous substance under normal operation condition@ shall be: <br /> installed inside a secondary containment system in the form of:-X—secondary pipe--- <br /> vault or <br /> lined trench to be sloped to a collection sump at the Low point of the piping. <br /> _ Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Y_ Automatic lingak tactors will be installasa rued ed n rpiping <br /> Manufacturer: h t-rtrn_ ModelMUA <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> I <br /> Annual Line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the Continuous monitoring system <br /> j fails or is disconnected. <br /> 1 20. = State Mater Resources Control Board "Facility (AY- and 'Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. what is the approximate depth to ground water: <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) <br /> 23. Total number of tanks on site after installation: <br /> 24. County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHO Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the site Mitigation Unit at (209) 469-3450. <br /> i <br /> The ow or oper or must acknowledge this responsibility for workp/na'n submittal by signature and date below. <br /> Name v� Title C. PKTWirJA Date <br /> CONDITIONS Of APPROVAL: <br /> 8 <br />