Laserfiche WebLink
SWRCB,January 2002 • 41101 Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard ® Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum N Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#l-Diesel West Sump#2-Diesel East Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 34" 33" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 17" SEP 3 0 2016 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 16" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry ENVIRONMENTAI HEALTH <br /> Portion of Sump Tested' Water Level 27 Water Level 27 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ®Yes 0 No 0 NA ®Yes 0 No (INA 0 Yes 0 No DNA 0 Yes 0 No DNA <br /> oduct and water)?� <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe <br /> shutdown?* ®Yes 0 No DNA ®Yes 0 No DNA Dyes 0 No DNA 0 Yes 0 No DNA <br /> Was fail-safe verified to be <br /> operational?* 0 Yes ®No DNA 0 Yes ®No DNA 0 Yes 0 No DNA 0 Yes 0 No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 minutes 5 minutes <br /> test: <br /> Test Start Time: 8:00 8:45 <br /> Initial Reading(114): .001 .001 <br /> Test End Time: 8:30 9:15 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 minutes 30 minutes <br /> Change in Reading(RF-R4): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 minutes .005/30 minutes <br /> Test Result: ® Pass 0 Fail ® Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? ®Yes 0 No 0 NA M Yes 0 No DNA , 0 Yes 0 No DNA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and <br /> verified functional after testis . ®Yes 0 No 0 NA ®Yes 0 No 0 NA 0 Yes 0 No (INA 0 Yes 0 No DNA <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up orfailed tests) <br /> Repairs made to both diesel STP sumps,re-glass sumps containment walls/collars,installed Bravo F-Series retrofit boot kits <br /> on all conduits and all secondary containment product lines. On both sumps#1 &-#2 perform test and both passed. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />