My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2300 - Underground Storage Tank Program
>
PR0232523
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:29:57 PM
Creation date
11/7/2018 6:59:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232523
PE
2361
FACILITY_ID
FA0003833
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16888 McKinley Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\16888\PR0232523\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
3/15/2017 3:43:37 PM
QuestysRecordID
3353613
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002 • Page_of_ <br /> 7. UNDER-DLSPENSER CONTAINMENT TESTING <br /> Test Method Developed By: D UDC Manufacturer 0 Industry Standard 0 Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: D Pressure 0 Vacuum 0 Hydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom toTop <br /> of Highest Piping Penetration: SEP 3 2016 <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> — EN ARONVEN TAtttEAtTPt- <br /> testis ' DEPAR MENT <br /> .Portion ofUDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes DNo DNA 0 Yes DNo DNA Dyes DNo DNA D Yes D No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* D Yes DNo DNA D Yes DNo DNA D Yes DNo DNA 0 Yes 0 No 0 NA <br /> Was fail-safe verified to be <br /> o erationat?* D Yes D No D NA 0 Yes D No 0 NA D Yes DNo DNA ❑Yes DNo DNA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading <br /> Test End Time: <br /> Final Reading Rr): <br /> Test Duration: <br /> Change in Reading(RF-Pi): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: D Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail D Pass 0 Fail <br /> Was sensor removed for testing? 0 Yes DNo DNA D Yes DNo DNA LoYes 0 No DNA D Yes 0 No DNA <br /> Was sensor properly replaced and <br /> verified functional after testis ? 0 Yes 0 No D NA D Yes DNo DNA 0 Yes 0 No D NA D Yes DNo DNA <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See S WRCB LO-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.