My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
1950
>
2300 - Underground Storage Tank Program
>
PR0504240
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 9:26:42 AM
Creation date
11/7/2018 7:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0504240
PE
2361
FACILITY_ID
FA0006136
FACILITY_NAME
QUICK TRUCK REPAIR
STREET_NUMBER
1950
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15308006
CURRENT_STATUS
02
SITE_LOCATION
1950 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MINER\1950\PR0504240\INSTALL\1995 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM PRINTSET INFORMATION <br /> 1. �rj//� Four complete sets of plans (To inc Lude specification sheets and/or equipment brochures if not on file). <br /> 2. tOIL- Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show Location and rxnber of tanks. <br /> 4. V& Tank cross-sectional diagram included on prints submitted. <br /> 5. fIK ✓ Detail of tank, piping System, excavation and cover. 1m�L x✓ !7 v.a4. <br /> 6. �.��'- � Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) & 26351 <br /> Verification of product conpatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. / i Manufacturers written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> 9. . Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br /> [Section 2635 (b) (6) & (7)] <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon coapletion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # It ' C ,Z k # # <br /> CAPACITY (2.0(D0 lo000 <br /> MANUFACTURER MoD EE" fv\p-OGq,N <br /> OmuO tC Dew a�E <br /> COMPOSITION u+ww STEEL ww.,� STG£� <br /> MODEL <br /> u.+..:aocl) <br /> PRODUCT GASOI�uC D��.b3wd 2. <br /> CORROSION PROTECTION f7'bCL(- A%5 Fi$Ef-/e�NSs <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL 7 L S L?S <br /> 13. TANK(s) TO BE INSTALLED <br /> ✓^ v A. Steel-clad with fiberglass reinforced plastic. <br /> ±4A B. Holiday test required immediately before --setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br /> Nom- C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> D. Non-clad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (m]nimm semi-annual inspection requirement). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.