Laserfiche WebLink
t <br /> V ..r <br /> E. Other types of tanks. <br /> (1) Chemical composition of material stored is provided. <br /> (2) Chemical abstract service number (CAS#) <br /> 14. Overflow protection systems (detail drawing of spill catchment basins)/piping sump(s) required, including tank fill and all <br /> openings). [Section 2635 (b) (8)) <br /> 04 A. Spill catchment basin. <br /> C—V�Capacity: TWo 56,4L /4 C FN TE,[ <br /> Type: 7H2 cE o a r <br /> B. Manual monitoring ( r vehicle fuels only). <br /> (1J tten filling procedure: ion 2635 Cg> (A) I <br /> / /(a) Tank volume city is at 1O3X 1200 gallons. <br /> _ (b) M!etaP4product a <br /> nte T and tank capacity <br /> j ermined immedte prior to filling. <br /> C. Mechanical/Electronic monitoring (mandatofor non-motor vehicle fuel tanks) [Section 2635 (8) (A) (B) (C)) <br /> (1) Level sensing device and #2 or #3 below. <br /> (2) Audible/visual alarm triggered by a Liquid level sensor. <br /> 0� (3) Automatic shut-off. (7'f�) 4e 1 <br /> 15. Double-waited tank and system allow for monitoring of the annular space. <br /> [Section 2635 (8) (A) (B) (C)) <br /> S A. Release from tO container designed to drain to a specific Location within the anular space to be detected by <br /> a monitoring device or method. <br /> T B. Continuous electronic monitoring connected to audible/visual alarm system. <br /> C. Type of Detectors (Detail of monitoring equipment as installed). <br /> (1) Brand Name: ✓E6♦c-.c ,(o. r' <br /> 6!4 (2) Model Number. 7—(- 5, 3 40 <br /> 4111-- (3) Sensor Type: — Vapor squid both. <br /> 455IK—(4) Sensor Specification. <br /> 4� (5) Brochures provided. <br /> ' (6) Manufacturer's written installation instructions. <br /> Locatioank): of.?1.S+smprobe f� (piping): <br /> 16. Nm Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or double- <br /> wall UST. [Section 2631 (r)) <br /> A. Approved by a nationally recognized independent testing organization. <br /> 8. Demonstration of integrity with the 10 tank or double waited UST. <br /> 17. Tanks subject to floatation. [Section 2631 (s)) <br /> "yam A. Anchored by deadman or slab. <br /> B. Anchors to be installed as specified by manufacturer. <br /> ✓ C. Installation details provided on plans. <br /> _ D. Calculations provided. <br /> 18. rYA Fiber Liners between tank(s) and excavation to prevent infiltration of native soil into backfill material. <br /> 5 <br />