My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peterson Hydraulics, Inc. <br /> 1653 W. El Segundo Blvd. Gardena, CA. 90249 <br /> (310)323-3155 phone- (310)323-3606 fax <br /> Contractor License: 631515 www.peterson hyd ra u lies.com <br /> "Providing Service To The Vehicle Service Industry" <br /> Response to SJC HED deficiency notice for SR0069410 <br /> San Joaquin RTD, 2849 E. Myrtel,Scockton <br /> 6-12-14 <br /> 1. Page 3 with workers comp information and Stockton FD and BD permit numbers attached as#1. <br /> 2. Page 8 of application with specific sensor models attached as#2. Also shown on drawing <br /> FSO.03. <br /> 3. IIealth and safety plan has not been established by SJRTD. Diagram and quickest route to a <br /> Hospital is attached as#3. <br /> 4. Blue Prints submitted include Engineered Stamped drawings. <br /> 5. ICC installer's certification for UST is submitted as#5. <br /> 6. Current installation instructions for UST manufactured by Containment Solutions, ins.Attached <br /> as#6. <br /> 7. A complete fuel system submittal including third party listings has been attached as#7. <br /> 8. Third party testing verification for UST components attached as #8. <br /> 9. Buoyancy calculation submitted as part of the deadmen calculation on FS1 1.01 details I and 2. <br /> 10. Drawings for deadmen anchors and components provided on FS4.02 and FS4.03. <br /> 11. Calculation for flapper drop tube length to shut off at 95%per 2635b.2 attached as #10 <br /> 12. Top of Fuel filter transition sump and containment arca is shown on drawing FS9.01 detail 3and <br /> FS 10.01 detail 1. <br /> 13. Fill and turbine sumps are monitored by vacuum sensors attached to FRP between pumps on <br /> FS7.01 detail 2. <br /> 14. Diesel tanks manifold(siphon line)shown on FS4.01 and FS2.16. <br /> 15. Programming information for pump operation is shown in note on FSO.01 and is attached as#15. <br /> 16. Double wall sumps depicted as such on drawing FS9.01 and striker plate shown on FS9.03 has <br /> been labeled. <br /> 17. A note has been added to drawing FS9.03 that describes ball float location and operation in <br /> relation to over fill valve. Calculation attached as #11. <br /> 18. OPW vapor tight overfill prevention valve installation and maintenance instructions attached as <br /> #18. <br /> 19. Shroud boot listed on FSO.03 items 6-9 is labeled as manufactured by OPW. <br /> 20. Could not find referenced note to FS-108 on FSO.01. No drawing FS-108 is included with this <br /> submittal. <br /> 21. Smith Fiberglass piping considerations for penetration through concrete is attached as#21. <br /> 22. No water wells or septic tanks are located on the construction site. The storm drain location has <br /> been shown on drawing FS 1.00. <br /> 23. Spill prevention control for the AS'r has been shown on drawing FS2.26.- <br /> a✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.