My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> t " Do not connect the air supply directly to the annular <br /> Do not pressurize 4',6',8'and 10'diameter tanks over 5 space monitoring fitting or tank damage will result. <br /> psig(35 kPa).Do not pressurize 12'diameter tanks over 3 • Prepare for testing. <br /> psig(21 kPa).Tank damage or physical injury may result - Replace all fitting plugs with plugs suitable for the <br /> The following instructions apply to all air tests described product to be stored in the tank. <br /> in Sections D1 to D9. Some Non Petroleum tanks are not - Clean factory pipe dope from plugs and fittings. <br /> field air-testable and require a post installation water test Apply pipe dope suitable for the material being <br /> VISUAL AIR/SOAP TEST - Reinstall and tighten fitting plugs. <br /> To be performed on all tanks after unloading from the truck. - Assemble the required number of"Tank Test <br /> • Single-Wall and Dry Annular Space Tanks:air/soap Manifolds"(Figure C-1)and"Annular Space Gauge <br /> tests must be performed at the job site prior to and Valves"(Figure C-2). <br /> installation to verify the absence of damage. <br /> (Sections D1 to D6) - Gauges must have a maximum full-scale reading <br /> - For tanks shipped with annular of 15 psig(40 kPa)with %.psig (1 kPa)or smaller <br /> pp space under vacuum, increments. <br /> refer to Supplemental Documents-Section R. <br /> - Pressure-relief device must be sized and set to <br /> • Liquid Filled Annular Space Tanks:air/soap tests on prevent the tank from being pressurized in excess <br /> accessories and fittings can be performed after the of the maximum allowed test pressure <br /> tank is in the excavation. (Sections D7 to 139) (5 psig/35 kPa maximum or 3 psig/21 kPa <br /> • All tanks must be vented at all times except as defined for 12'tanks). <br /> during testing. <br /> FOR ALL AIR TESTS: <br /> • All petroleum tanks with a UL label and all potable Do not stand on or approach endcaps,manways,or <br /> water tanks must be air tested prior to installation. fittings while pressurizing tanks. Do not lift or hoist <br /> tank under pressure.These actions could result in <br /> • Use a contractor supplied"Tank Test Manifold" death or serious injury. <br /> connected to a tank primary fitting (see Figure C-1). <br /> Figure C-1 Do not pressurize 4', 6', 8'and 10'diameter tanks <br /> over 5 psig(35 kPa). Do not pressurize 12'diameter <br /> Tank Test Manifold tanks over 3 psig(21 kPa). <br /> Air supply valve open ? Air Supply Valve Closed Pressure gauge readings can be affected by changes <br /> Air Supply in ambient air temperature.Allow for pressure <br /> Gauge fluctuations when tanks are subject to temperature <br /> changes. <br /> • Prepare Soap Solution. <br /> Backup) 6 - weather soap Warm weathsolution <br /> Air Supply Gauge Pressure-Relief p <br /> Device • 5 gallons of water <br /> Primary • 8 ounces of household dishwashing <br /> Tank Ftgng detergent <br /> For tanks with any dry annular space configurations, - Freezing conditions soap solution <br /> including double-wall bulkheads: 4 gallons of water <br /> • Use a contractor supplied"Annular Space Gauge and 8 ounces household dishwashing detergent <br /> Valve'connected to the annular space fitting 1 gallon windshield washer solution <br /> (see Figure C-2). • The entire tank surface must be covered with the <br /> Figure C-2 soap solution and visually inspected for leaks, as <br /> Annular Space Gauge and Valve indicated by the presence of active air bubbles. <br /> • Anytime bubbles are observed around fittings, plugs, <br /> valve open Valve Closed and gaskets;tighten and retest. <br /> Pressure • In the unlikely event a tank leak is discovered, <br /> Gauge discontinue the installation and immediately call CSI <br /> Field Service to schedule a repair. <br /> Annularspace • If the tank is a Non Petroleum tank and requires <br /> or Double-Wall <br /> Bulkhead Fitting post installation water testing,follow the procedures <br /> in Section D10. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.