Laserfiche WebLink
Handling & <br /> Preparation - Bed and BackfiA, B <br /> LIFTING CSI DEADMEN <br /> 1.. iB. BED AND BACKFILL <br /> I <br /> Use only the anchor points when lifting and Not using approved backfill material may result <br /> positioning CSI deadmen.Failure to do so could <br /> result in death or serious injury. in tank failure and environmental contamination. <br /> The use of approved backfill material is critical <br /> • Insure lifting equipment is rated to handle the load to long term tank performance. <br /> before lifting. For deadmen sizes and weights use Do not mix approved backfill with sand or native soil. <br /> Table A-5. <br /> • Lift deadman using a minimum of two equally spaced Do not backfill tank with sand or native soil. <br /> anchor points. Replace all excavated native soil with approved <br /> • The angle from the deadmen to the lifting equipment backfill of proper size and gradation. Use backfill <br /> should always be between 600 and 900(see Figure A-4). which meets ASTM C-33 for quality and soundness. <br /> • Require your backfill supplier to certify, with a sieve <br /> Figure A4 analysis, that the backfill meets this specification. <br /> 1 Sieve analysis must be attached to the Tank <br /> T Installation Checklist. <br /> • Keep backfill dry and free of ice in freezing conditions. <br /> Anchor PointLifting Chain or Sling Use only approved pea gravel or crushed stone <br /> A6090' (see Figure B-1): <br /> Figure B-1 <br /> •4; .. �► •'.'► �.� �• ;►.•;►: • ► + PEA GRAVEL CRUSHED STONE <br /> • The deadmen type, lengths, and the number of anchor <br /> points are dependent upon the tank diameter, model 3/4" <br /> v and capacity. 1/2„ <br /> (19 mm) (12 mm) <br /> • Refer to Supplemental Documents(Section R)for <br /> additional information on deadmen anchors. <br /> TABLE A-5 Maximum Size Maximum Size <br /> Deadmen Anchors <br /> Length (ft) Weight <br /> 3/4rr <br /> 12"x 12" 18"x 8" Pounds Kilograms <br /> 12 1,655 750 1�2 r <br /> 16 2,250 1,020 <br /> 18 2,550 1,156 <br /> 20 2,850 1,293 <br /> Pea Gravel: Crushed Stone or Gravel: <br /> 14 1,686 765 <br /> 18 2,100 952 Clean naturally-rounded Washed,with angular <br /> aggregate with particle particle sizes no larger <br /> 22 2,500 1,134 sizes no larger than%" than 'A"with no more <br /> with no more than 5% than 51/6 passing a <br /> LIFTING TANK SUMPS OR RISERS passing a#8 sieve. #8 sieve. <br /> • usually inspect the sump components for shipping Dry density must be a Dry density must be a <br /> damage. If damage is found, contact CSI Field minimum fo t. pounds minimum fo t. pounds <br /> 9 9 per cubic foot. per cubic foot. <br /> Service. <br /> • Wear gloves. Note: If material which meets these specifications is not <br /> • Do not roll,drop or bounce. available, contact Tank Technical Support for information <br /> • Set on smooth surface. on approved alternate materials and installation <br /> • The sump must be secured to prevent damage from instructions. Using other backfill without Containment <br /> Solutions'prior written approval will void the tank <br /> high winds. warranty and may result in tank failure. <br /> • Refer to Supplemental Documents(Section R)for <br /> additional information on tank sumps. <br /> s <br />