My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Handling & <br /> Preparation - Bed and BackfiA, B <br /> LIFTING CSI DEADMEN <br /> 1.. iB. BED AND BACKFILL <br /> I <br /> Use only the anchor points when lifting and Not using approved backfill material may result <br /> positioning CSI deadmen.Failure to do so could <br /> result in death or serious injury. in tank failure and environmental contamination. <br /> The use of approved backfill material is critical <br /> • Insure lifting equipment is rated to handle the load to long term tank performance. <br /> before lifting. For deadmen sizes and weights use Do not mix approved backfill with sand or native soil. <br /> Table A-5. <br /> • Lift deadman using a minimum of two equally spaced Do not backfill tank with sand or native soil. <br /> anchor points. Replace all excavated native soil with approved <br /> • The angle from the deadmen to the lifting equipment backfill of proper size and gradation. Use backfill <br /> should always be between 600 and 900(see Figure A-4). which meets ASTM C-33 for quality and soundness. <br /> • Require your backfill supplier to certify, with a sieve <br /> Figure A4 analysis, that the backfill meets this specification. <br /> 1 Sieve analysis must be attached to the Tank <br /> T Installation Checklist. <br /> • Keep backfill dry and free of ice in freezing conditions. <br /> Anchor PointLifting Chain or Sling Use only approved pea gravel or crushed stone <br /> A6090' (see Figure B-1): <br /> Figure B-1 <br /> •4; .. �► •'.'► �.� �• ;►.•;►: • ► + PEA GRAVEL CRUSHED STONE <br /> • The deadmen type, lengths, and the number of anchor <br /> points are dependent upon the tank diameter, model 3/4" <br /> v and capacity. 1/2„ <br /> (19 mm) (12 mm) <br /> • Refer to Supplemental Documents(Section R)for <br /> additional information on deadmen anchors. <br /> TABLE A-5 Maximum Size Maximum Size <br /> Deadmen Anchors <br /> Length (ft) Weight <br /> 3/4rr <br /> 12"x 12" 18"x 8" Pounds Kilograms <br /> 12 1,655 750 1�2 r <br /> 16 2,250 1,020 <br /> 18 2,550 1,156 <br /> 20 2,850 1,293 <br /> Pea Gravel: Crushed Stone or Gravel: <br /> 14 1,686 765 <br /> 18 2,100 952 Clean naturally-rounded Washed,with angular <br /> aggregate with particle particle sizes no larger <br /> 22 2,500 1,134 sizes no larger than%" than 'A"with no more <br /> with no more than 5% than 51/6 passing a <br /> LIFTING TANK SUMPS OR RISERS passing a#8 sieve. #8 sieve. <br /> • usually inspect the sump components for shipping Dry density must be a Dry density must be a <br /> damage. If damage is found, contact CSI Field minimum fo t. pounds minimum fo t. pounds <br /> 9 9 per cubic foot. per cubic foot. <br /> Service. <br /> • Wear gloves. Note: If material which meets these specifications is not <br /> • Do not roll,drop or bounce. available, contact Tank Technical Support for information <br /> • Set on smooth surface. on approved alternate materials and installation <br /> • The sump must be secured to prevent damage from instructions. Using other backfill without Containment <br /> Solutions'prior written approval will void the tank <br /> high winds. warranty and may result in tank failure. <br /> • Refer to Supplemental Documents(Section R)for <br /> additional information on tank sumps. <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.