Laserfiche WebLink
Anchoring - . . H <br /> Figure H-8 When embedding anchor points at the time the pad is <br /> fabricated, the following design will meet the minimum <br /> required anchor points (see Figure H-9), <br /> FRP Tank <br /> Figure H-9 <br /> Scrap <br /> Smooth <br /> Anchor Hook <br /> Deadman or Anchor Pad Radius <br /> Point Turnbuckle -- <br /> .� Min- <br /> Tank Rebar +i <br /> Tank Shadow H ". Span 4"Min. <br /> 14-W' 16"Max. <br /> Deadman <br /> (18W-) 9'.... 8. (D112 <br /> -d 2) i • s; <br /> r s • <br /> Tank Diameter `Dimension"H" <br /> Tank Minimum Rebar' <br /> 4' 16" Rebar Loop Size Span <br /> Diameter <br /> 6' 27" (1 strap/anchor point) <br /> 8' 36" 4 #6 7'/z' <br /> 10' 42" 6' #8 10Y21' <br /> 8' #8 10'/z' <br /> 12' 50" <br /> This dimension is the distance from the hook point on the anchor 10' #10•• <br /> strap to the bottom of the deadman. 12' #10" 13'/i' <br /> Note:Wider or narrower span will reduce the strength of the anchor <br /> • CSI deadmen are supplied with'/."diameter, points below the required value- <br /> galvanized,adjustable anchor points. %"turnbuckles require a wire rope loop or shackle between <br /> • Move anchor points to match the hold-down strap turnbuckle and rebar anchor point because#10 rebar will not fit into <br /> locations on the tank ►.4 t1"with CSI split straps, 'i"eye turnbuckle. <br /> this must be done before placing deadmen in the <br /> hole. SPLIT STRAP ANCHORING SYSTEM <br /> • Place multiple deadmen, in contact, end to end. The CSI split strap anchor system is designed for use <br /> • Use one anchor point per strap end. in installations when personnel may not enter the hole. <br /> This system includes a two part strap and take-up <br /> CONCRETE ANCHOR PAD assembly at the tank top that may be used in <br /> The weight of the overburden acting on the concrete conjunction with GSI deadmen. <br /> anchor pad and the tank provides the anchoring force When using the split strap anchoring system, the <br /> (not the weight of the concrete anchor pad). placement of components is critical (see Figure H-10). <br /> For detailed instructions on using the split strap anchor <br /> • As a minimum,to counteract buoyancy,the anchor system refer to Supplemental Documents(Section R). <br /> pad for stable excavations must be at least 8"thick, <br /> with#6 rebar on 12"centers each way, constructed Figure H-10 <br /> per current ACI code. <br /> Take-Up <br /> • For stable conditions the pad must extend a minimum Assembly <br /> of 18"beyond the tank shadow.The pad must also ,•..• •�••• <br /> be at least the same length as the tank. <br /> • For unstable excavations, it is the responsibility of <br /> the tank owner or tank owner's representative to <br /> design the bottom pad thickness and reinforcement. <br /> Regardless of design,the anchor pad should extend <br /> to the excavation walls. Strap Strap <br /> • Poor soil conditions, local codes, seismic activity,etc. Csi <br /> may require increased reinforcement and anchor pad �� Deadmen <br /> thickness. Contact a soils consultant for specifications. <br /> Embedded anchor points should be designed for the <br /> working loads in Table H-2. �� n• ' ��� <br /> i <br /> 18 <br />