Laserfiche WebLink
i <br /> I <br /> San Joaquin Ronal Transit District, 2849 E. Myrtle `t:,~Stockton CA <br /> SR0069410 <br /> • A valid, current certificate of training from the manufacturer(s) of the component(s) being <br /> tested, repaired, or serviced. <br /> Additionally, <br /> Each person installing or testing any component must hold a certificate of training from the j <br /> manufacturer of that component. <br /> 4. The UST system must be compatible with the substance being stored, California Code of Regulations <br /> (CCR), Title 23, Section 2631.1. <br /> 5. All pi piping, fittings, sumps, and tanks must be certifiedby an independent testing organization and <br /> labeled as required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See Title 23 Chapter 16 <br /> Table B for complete,list.) Pursuant to Underwriters Laboratories Inc. (UL) listing requirements, only <br /> those products bearing the UL mark will be considered listed. ANY PART/PRODUCT NOT MARKED <br /> WITH THE UL LABEL OR ANOTHER LISTED TESTING ORGANIZATION WILL BE REJECTED. <br /> 6. All monitoring systems shall be listed in the CA State Water Resources Control Board (SWRCB) Local <br /> Guidance (LG) 113 letter. <br /> 7. All installation and testing shall be in compliance with manufacturer's instructions, CCR Title 23, <br /> Section 2635 and Section 2636. <br /> 8. All piping must slope to a containment sump with an audible/visual alarm. <br /> i <br /> 9. UST sumps must be constructed "product tight" as defined by California Health and Safety Code <br /> (HSC) Section 25290.1. <br /> 10. All tank top openings that are connected to the primary space of the UST must have secondary <br /> containment, audible/visual alarm and be product tight or terminate at grade. i <br /> 11. All secondary containment for the UST must be constructed per HSC Section 25290.1(c) (3). <br /> 12. The secondary containment system for the UST must be continuously monitored as required under <br /> HSC Section 25290.1 <br /> 13. Overfill 'prevention for the UST shall satisfy CCR Section 2635(b) (2) (A) pursuant to the permit <br /> application. <br /> i <br /> 14. All UST metal components in direct contact with the ground such as flexible connectors, swing joints, <br /> fittings, clamps, bands, and pumps shall have corrosion protection. <br /> 15. Any changes in the approved scope of work shall be submitted to the EHD for approval prior to <br /> commencing work.All new submittals supersede the previous ones. <br /> 16. A"Certification of Installation/Modification"form for each tank shall be submitted by the owner or the <br /> owners' agent[pursuant to CCR Section 2635(d)] before this install will be considered complete by the <br /> EHD. <br /> 17. This facility shall be created in the California Environmental Reporting System (CERS)with the <br /> appropriate Certified Unified Program Agency(CUPA) programs (Hazardous Materials, Hazardous <br />{ Waste, Underground Storage Tank and Aboveground Petroleum Storage Act) submittal elements <br /> made and accepted by the EHD prior to scheduling a final inspection. <br /> 18. An accurate and drawn to scale as-built plan must be submitted to the EHD prior to scheduling a final <br /> inspection. <br /> Page 2 of 3 <br /> 1 <br /> l Jt <br />