Laserfiche WebLink
INDIVIDLW TANK INFORMATION AN EST RESULTS <br /> ►Tar*nobgy <br /> 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER: 2228896 <br /> TEST DATE: 11/06/03 AUSTIN,TEXAS 78757(512)451-6334 <br /> SITE: USA #65 <br /> CLIENT: USA PETROLEUM <br /> Mimi <br /> Tank ID: 6K 3 Tank manifolded: NO Bottom to top fill in inches: <br /> Product: PREMIUM Vent manifolded: No Bottom to grade in inches: <br /> Capacity in gallons: 6,016 Vapor recovery manifolded: yzs Fill pipe length in inches: <br /> Diameter in inches: 96.00 Overfill protection: yEs Fill pipe diameter in inches: 4.0 <br /> Length in inches: 195 Overspill protection: yEs Stage I vapor recovery: DUAL. <br /> Material: Dw STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> AN-TEST RESULTS Test Method:VPLT .LEAK DETECTOR TEST.RESULT3 a. Test methods.FTA <br /> PSI at tank bottom: <br /> Newlpassed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JACKET <br /> Fluid volume in gallons: Model: Fane <br /> Tank water level in inches: SIN: 0331973259 <br /> Test time: NOT Open time in sec: 4.00 <br /> Number of thermisters: Holding psi: 19 NOT <br /> TESTED Resilient <br /> Specific gravity: y cc: 125 TESTED <br /> Water table depth in inches: rest leak rate ml/m: 189.0 <br /> Determined by (method): Metering psi: 12 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST 1: LILTSTest Method:UTS-4T es pe, pTic-ee <br /> ...LINE A . B C D <br /> Test time: Material: ENVIRON <br /> Ullage volume: Diameter(in): 1.5 <br /> Ullage pressure: Length (ft): 120.0 <br /> Results: Test psi: 50 <br /> Bleedback cc: 145 <br /> Test time(min): 30 <br /> DATA FOR UTSAT ONLY: Test 1:Stan time: 08:30 <br /> Time of test 1: Finish psi: 50 NOT NOT NOT <br /> Temperature: NOT Vol Change Cc: 0 TESTED TESTED TESTED <br /> P Test 2:Start time: 08:40 <br /> Flow rate(cfh): TESTED Finish psi: s0 <br /> Time of test 2: Vol change cc: 0 <br /> Test 3:Start time: 08:50 <br /> Temperature: Finish psi: 50 <br /> Flow rate(cfh): Vol change cc: 0 <br /> Time of test 3: Final gph: 0.000 <br /> Temperature: Result: PASS <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: yEs <br /> Printed 11/13/2003 14:44 SBOWERS <br />