My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO 1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 2:28:08 PM
Creation date
11/8/2018 9:36:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LODI\2500\PR0231356\COMPLIANCE INFO 1998-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRGB January,2002 • • Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ❑Industry Standard ❑ Professional Engineer <br /> [—]Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑ Hydrostatic <br /> []Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> 529MOMIM�- W711. <br /> Piping Run# 87 Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: Unleaded Unleaded Plus Premium Diesel <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/waterand 10 Min <br /> starting test: <br /> Test Start Time: 10:15 <br /> Initial Reading(RO: 5 PSI <br /> Test End Time: 11:15 <br /> Final Reading(RF): 5 PSI — — <br /> Test Duration: 60 Min <br /> Change in Reading(RF-Rj): 0 <br /> Pass/Fail Threshold or j <br /> PASSED 1 <br /> Criteria: _ <br /> Test Result: IMPass ❑Fail ❑ ❑Pass ❑Fail ❑ ❑Pass ❑Fail ❑ ❑Pass ❑Fail ❑ <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tesls) <br />
The URL can be used to link to this page
Your browser does not support the video tag.