Laserfiche WebLink
SWRGB January,2002 • • Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ❑Industry Standard ❑ Professional Engineer <br /> [—]Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑ Hydrostatic <br /> []Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> 529MOMIM�- W711. <br /> Piping Run# 87 Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: Unleaded Unleaded Plus Premium Diesel <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/waterand 10 Min <br /> starting test: <br /> Test Start Time: 10:15 <br /> Initial Reading(RO: 5 PSI <br /> Test End Time: 11:15 <br /> Final Reading(RF): 5 PSI — — <br /> Test Duration: 60 Min <br /> Change in Reading(RF-Rj): 0 <br /> Pass/Fail Threshold or j <br /> PASSED 1 <br /> Criteria: _ <br /> Test Result: IMPass ❑Fail ❑ ❑Pass ❑Fail ❑ ❑Pass ❑Fail ❑ ❑Pass ❑Fail ❑ <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tesls) <br />