My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:26:36 PM
Creation date
11/8/2018 9:38:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LOWELL\1975\PR0232521\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
11/29/2017 7:25:21 PM
QuestysRecordID
3737183
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iles 28 05 10: 31a JP Potroleum Service 91G3724873 p. 2 <br /> SWRCB,Ianuary 2002 Page—of- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(3)7ecify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run#I Piping Run#2 Piping Run#3 Plping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter: 3" Y Y 3" <br /> Length of Piping Run: 12' 12' 15' 15' <br /> Product Stored: Diesel Regular Diesel Regular <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 mm <br /> starting test: <br /> Test Start Time: 8:20 8:20 9:15 9:15 <br /> Initial Reading(RO: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test En"Ti4fne: 8:50 8:50 Final R5 PSI 5 PSI Test D30 min 30 min Change (RF-R& 0 0 Pass/For 0 drop 0 drop CriteriTest Rx pass 0 Fail x Pam ❑Fail Pass" ❑Fail <br /> Comments (include information on repairs made prior to testing, and recommended fallow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.