Laserfiche WebLink
Iles 28 05 10: 31a JP Potroleum Service 91G3724873 p. 2 <br /> SWRCB,Ianuary 2002 Page—of- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(3)7ecify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run#I Piping Run#2 Piping Run#3 Plping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter: 3" Y Y 3" <br /> Length of Piping Run: 12' 12' 15' 15' <br /> Product Stored: Diesel Regular Diesel Regular <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 mm <br /> starting test: <br /> Test Start Time: 8:20 8:20 9:15 9:15 <br /> Initial Reading(RO: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test En"Ti4fne: 8:50 8:50 Final R5 PSI 5 PSI Test D30 min 30 min Change (RF-R& 0 0 Pass/For 0 drop 0 drop CriteriTest Rx pass 0 Fail x Pam ❑Fail Pass" ❑Fail <br /> Comments (include information on repairs made prior to testing, and recommended fallow-up for failed tests) <br />