My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:26:36 PM
Creation date
11/8/2018 9:38:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LOWELL\1975\PR0232521\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
11/29/2017 7:25:21 PM
QuestysRecordID
3737183
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 %wi Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Cald.vell Systems Equipment Resolution: .005/30 min <br /> Sump# 1 Sump#2 Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 4S' 45" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 24" 22„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 27, 25„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes ❑No ❑NA x Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes 0 No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes x No ❑NA ❑Yes x No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 8:25 9:16 <br /> Initial Reading(Rj): .00" .00" .00" .00" <br /> Test End Time: 8:55 9:46 <br /> Final Reading(RF): .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-Ri): .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass ❑Fail a Pass ❑Fail G Pass E Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? xYes 0 N 0 N xYes 0 N El NA xYes ❑No DNA ❑Yes ❑No DNA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.