Laserfiche WebLink
n <br /> SWRCB,January 2002 '`/ *.f Page of <br /> 7. UNDER-DISPENSER CONTAINMENT MQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC# 1&2 UDC#3&4 UDC# UDC# <br /> UDC Manufacturer: Total Containment Total Containment <br /> UDC Material: Poly Poly <br /> UDC Depth: 25" 25" <br /> Height from UDC Bottom to Top 13" 11" <br /> of Hi est Piping Penetration: <br /> Height from UDC Bottom to 13" 10" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested 2"Above highest Piping enetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> Operational?* ❑Yes x No ❑NA ❑Yes x No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 9:33 10:05 <br /> Initial Reading(R,): .00" .00" .00" .00" <br /> Test End Time: 10:03 10:35 <br /> Final Reading(RF): .00 .0025 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Chane in Reading(RF-R): .00 .0025 <br /> Pass/FaiI Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail ❑ Paw ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No [INA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />