My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Pipe installation Trench width <br /> (continued) A trench width should optimally allow six inches between trench wall and pipe. <br /> For multiple lines in the same trench,separate the pipes by at least four inches. <br /> ® T • . a Q , o QO ' <br /> l / C Q 4(min) Q <br /> 0 � <br /> a <br /> 18 min ------ ------------------------ O <br /> 4(min) <br /> i • Q <br /> The pipe should be completely surrounded with Sand,pea gravel or .! Q <br /> select backfill.Native soils should never beused 6(min) Crushed Stone <br /> as backfill.Optimaispacing between trench wall <br /> and pipe is 6 inches.M otmensicns in drawing �'=- - a•.;- =-- = -•`----' o-=- -0 <br /> (not to scale)are in inches. L <br /> Pipe protection <br /> Although fiberglass pipe has high strength properties, it must be protected <br /> against impact damage which is most likely to result either from improper <br /> handling or backfilling.Avoid impact damage to pipe when driving in locator or <br /> marking stakes. <br /> Sand, pea gravel or crushed stone(maximum size 1/2 inch(12 mm))are recom- <br /> mended as padding to protect the pipe from rock damage during backfill and <br /> against abrasion during operation. Four to six inches(100 to 150 mm)of proper <br /> backfill should surround the pipe.When the pipe is laid near or through concrete, <br /> it must be wrapped with rubber or foam padding to avoid direct contact, and <br /> the subgrade should be well compacted to prevent differential settling. <br /> Supporting valves and accessories <br /> When heavy items such as valves are used in a line,their weight must be <br /> supported separately. <br /> Connecting to fittings <br /> Avoid delays caused by not having the right fittings on hand by taking the time <br /> to lay out the job in advance.A diagram of the fittings layout will speed up the <br /> job and eliminate unnecessary rework. <br /> Flex connectors should be used whenr �; <br /> connecting pipe to dispensers(left)and turbines - - " -'"` <br /> (tight). The use o/"swingicints'•is not <br /> recommended. - `-' <br /> iw <br /> Jx. <br /> 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.