My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Typical installations When installing vapor return piping, maintain a constant slope from dispenser <br /> (continued) to storage tank. Lines must be free of dips or low spots. Use optional thief port <br /> assembly as required to collect condensed product vapors. <br /> ® Pressure test entire system before completing backfill operation. <br /> Install vent caps per local code. <br /> Backfill material should be clean washed sand, pea gravel or crushed stone <br /> (max 1/2 inch). Never use native soils. <br /> Minimum burial depth is subject to local fire marshal regulations. <br /> It is necessary to consider state and local regulations as well as customer's <br /> specifications prior to installation. <br /> A typical three-product service station layout <br /> incorporating Stage l and Stage 11 vapor <br /> recovery.Ameron recommends the use of <br /> flexible connectors at dispensers and tanks. <br /> Alternatively,a 4-ft'dogleg"is allowable <br /> perAPl Specification 1615.System <br /> components are not shown to scale. it <br /> iC <br /> i <br /> Vapor return lines should maintain a constant <br /> slope from dispenser to tank.Although not <br /> shown in this Brewing, vapor and product fines <br /> are typically situated at the same subgrade <br /> elevation.Crossovers should be made as shown O <br /> in the photograph on page 12. <br /> Concrete <br /> Asphalt <br /> Approved fill <br /> Legend: Product Vapor 1111111111 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.