Laserfiche WebLink
:^-• "'�•9:iwr6t�:�:,G:i:: �/s: :u.:bZ:d.'l•.S:Si.:Ilc..r�n.....i'."t' uLt3d�T-�,..5'M1SILn>.••.r:+;gffig�-av�r� <br /> • Center coupling shells over all primary piping sleeve couplings. F^ <br /> If space is limited between two primary fittings such that.a full coupling will not <br /> fit, the coupling can be cut approximately in half. <br /> After dry fitting the Containment piping, remove it from over the primary piping <br /> and sand the ends of the Containment pipe and the bonding surfaces of the <br /> Containment fittings with coarse sandpaper, emery cloth or flapper sander. Brush <br /> all dust off the bonding surfaces with a clean rag or clean paintbrush. Care must <br /> be taken to not touch or in any way contaminate the sanded surfaces prior to <br /> bonding because the adhesive will not bond properly and leaks may occur. <br /> A <br />