My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAINING FLEXIBLE Containment elbows and reducers along with short pieces of piping can be <br /> CONNECTORS combined to encase the 1-1R" flemble connector to just below the shear valve_ <br /> The Containment fittings will not seal on the body of the flexible connector. A <br /> short galvanized nipple between the end of the connector and the shear valve <br /> should be provided for sealing of the reducer. <br /> •, BONDING AND TESTING Bonding of primary system can only commence after Containment pipe has been <br /> PRIMARY SYSTEM positioned over it and all final adjustments made for clearance or interference <br /> problems. Bonding of primary lines in accordance with Ameron Bulletin 7501 can <br /> be accomplished by sliding the Containment pipe away from the primary line <br /> bonding area. Take care to not disturb the bonds on the primary piping before <br /> the C20HT adhesive cures. <br /> Primary lines must be tested before installing the Containment fittings to allow <br /> visual and/or soap testing of primary lines and fittings. <br /> M C[NG OF C20HT In cold weather, warming the resin to 70°F (21°C) is required to permit good <br /> (3" & 4" Assembly) & mixing and easier application. <br /> SC-10 ADHESIVE <br /> (For 6" Assembly) To mix the adhesive, first empty all the hardener' into the can of resin. Mix all <br /> of the hardener and resin in the supplied proportions, never try to split a kit. <br /> Mix the hardener and resin thoroughly with the wooden spatula until all streaks <br /> are gone and the adhesive has a smooth uniform color. Take care to scrape and <br /> mix all resin from the lid and from under the upper lip of the can. Stirring too <br /> vigorously can either cause some hardener to splash out or result in excessive air <br /> entrapment. <br /> • ' The hardener contained in the adhesive kits might burn the skin. Inhaling the vapors should be avoided. The <br /> label precautions should be read and observed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.