Laserfiche WebLink
Installation Ovivew <br /> Fiberglas° underground ' <br /> tanks must be installed in <br /> accordance with the installa- <br /> tion instructions (O/C TANKS r <br /> publication number 3-PE-6304). <br /> This document should be part <br /> of your tank specifications. 4y" <br /> Some key installation steps y , <br /> are highlighted below. See the <br /> published installation instruc- <br /> tions for complete details. <br /> Double-wall tanks must be <br /> mechanically unloaded from <br /> the delivery truck using a <br /> backhoe or crane. <br /> A special air test procedure <br /> is required for double-wall <br /> tanks. A special air test fix- <br /> ture is shipped with the tank. <br /> Fiberglas tanks must be pres- <br /> surized and inspected for leaks <br /> using a soapy water solution. <br /> Leak testing prior to installa- <br /> tion helps insure that Fiberglas If the Hydrostatic Tank Moni- Properly installed, Fiberglas <br /> tanks were not damaged in toring system is activated by underground petroleum <br /> shipment. filling at the jobsite, the tank storage tanks can provide <br /> Installation for double-wall tanks cavity must be filled by pouring extended service in storing <br /> is similar to the procedure for the liquid into the cavity. Use petroleum products without <br /> single-wall tanks. O/C TANKS tap water or an acceptable corrosion-caused leaks and <br /> requires pea gravel backfill antifreeze mixture as the without maintenance. <br /> material; this gravel is a natu- monitoring fluid. <br /> rally rounded aggregate rang- O/C TANKS maintains a listing <br /> ing from 1/8" to 3/4" diameter. All tanks must be vented. of over 1,200 independent con- <br /> If pea gravel is not available, Fiberglas tanks are designed tractors who have been trained <br /> washed stone crushings (1/8" for operation at atmospheric to install Fiberglas tanks. On <br /> to 1/2" diameter) meeting pressure only, except for use request,we can provide names <br /> ASTM C-33 may be used as with vapor recovery systems, of trained contractors. <br /> an alternate. Other backfill provided the pressure or <br /> materials must not be used vacuum does not exceed <br /> without consulting O/C TANKS 1 psi maximum on the primary <br /> for written approval. tank. If the monitoring cavity <br /> between the inner and outer <br /> A minimum of 12" backfill tank is vented, it must be <br /> bedding is required between vented independently from <br /> the tank and the excavation the primary tank. <br /> bottom or concrete anchoring <br /> pad. Tanks must not be For additional details, request <br /> installed on timbers, beams Underground Tank Installations <br /> or cradles. (O/C TANKS publication <br /> number 3-PE-6304). <br /> 27 <br />