My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
INSTALL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:53:13 AM
Creation date
11/8/2018 9:39:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MACARTHUR\2650\PR0232573\INSTALL 1992.PDF
QuestysFileName
INSTALL 1992
QuestysRecordDate
8/2/2017 4:00:35 PM
QuestysRecordID
3544491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation InstructioWTurbine Enclosure (AWodels) <br /> G1. General Ste'#1—Sand and Clean Mating Surfaces <br /> Wipe the mating surfaces clean. <br /> The turbine enclosure provides housing for a submersible pump and also Using the supplied sandpaper,sand the bottom 3"of the turbine <br /> rovides a termination point for double-wall piping systems.The secon- enclosure interior surface.Then sand the outside surface of the adhesive <br /> ary containment collar provides containment of spilled liquids and a channel on the secondary containment collar.All surfaces must be <br /> location for the leak monitoring sensor. sanded until they appear"white"in color. <br /> When there is concern regarding the ingress of water,the turbine Step#2—Position Turbine Enclosure on Collar <br /> enclosure may be cemented(using the optional adhesive kit)at the job- When positioned on the collar,the turbine enclosure fit will be snug.Use <br /> site,to the secondary containment collar,which is factory installed to the rubber mal let,if necessary,to seat the turbine enclosure on the collar. <br /> tank polyethylene <br /> and lid <br /> is all then ping aced <br /> over <br /> connections,the Before mixing or applying the adhesive,confirm that the surfaces inside <br /> polyethylene top and lsigne t prevent water run-off <br /> from entering <br /> the adhesive channel are dr and clean. <br /> polyethylene top is designed to prevent water run-off from entering the Y <br /> turbine enclosure.However,if groundwater rises to the polyethylene top, Step B3—Mix and Apply the Adhesive <br /> water will infiltrate the turbine enclosure. Thoroughly mix the two-part adhesive in accordance with the detailed <br /> For high groundwater conditions at or above subgrade,a sealed turbine mixing instructions contained in the adhesive kit.See the Adhesive <br /> enclosure should be used to prevent water infiltration. Application Guidelines. <br /> WARNING:TO PREVENT FIRE OR EXPLOSION HAZARD,0/C Apply the adhesive with the supplied putty knife.Fill the adhesive channel <br /> TANKS RECOMMENDS AIR-DRIVEN TOOLS WHENEVER POSSI- from inside the turbine enclosure.Adhesive can be applied either before <br /> BLE.DO NOT USE ELECTRIC POWER TOOLS WHERE FLAM- or after backfilling around the turbine enclosure. <br /> MABLE VAPORS OR LIQUIDS EXIST.ALSO,WHEN ELECTRIC WARNING:ALWAYS WEAR PROTECTIVE GOGGLES AND GLOVES <br /> HAND TOOLS ARE USED,BE AWARE OF POTENTIAL SHOCK WHEN MIXING AND APPLYING ADHESIVE.THE ADHESIVE <br /> HAZARDS;WEAR PROTECTIVE CLOTHING AND EYE MATERIALS ARE FLAMMABLE.KEEP THE ADHESIVE MATERIALS <br /> PROTECTION. AWAY FROM SPARKS AND IGNITION SOURCES. <br /> O Sand these <br /> G2. Handling surfaces first, <br /> HDPE placeturbine <br /> Wear gloves to manually lift the turbine enclosure.Do not roll or drop.Set Top enclosure onto <br /> on smooth ground.If high winds are anticipated,the contractor is respon- Turbine collar,then <br /> sible for tying down to prevent damage from being moved by high winds. Enclosure applyadhesive <br /> into the adhesive <br /> Adhesive I channel. <br /> G3. Inspection <br /> Adhesives Turbine <br /> Before installation,visually inspect the turbine enclosure for potential Channel I Enclosure <br /> shipping damage.If damage is found,contact the O/C TAN KS Field <br /> Service office nearest you.Phone numbers are listed in section Al 9. Collar Collar <br /> �G4. Tank Burial Depth Step 84—Curing <br /> Before installing the turbine enclosure,measure the length to be sure it is Allow the adhesive to cure 24 hours minimum.The mating parts must not <br /> long enough for the intended burial depth.Turbine enclosures are be moved before the adhesive is fully cured. <br /> available in lengths of one foot increments to accommodate deeper burial For outside ambient temperatures below 60°F,supplemental heat is <br /> depths. required to initiate the adhesive curing process(see Adhesive Applica- <br /> If the turbine enclosure is too long,it can be trimmed to length before or tion Guidelines). <br /> after it is installed on the collar.If cut to length at the jobsite,cut the upper <br /> portion of the turbine enclosure.To assist in field cutting,cut lines are <br /> marked in 3"increments at enclosure top.if the bottom portion of the Adhesive Application Guidelines <br /> turbine enclosure is trimmed,it must be evenly cut within t l/4".Acarbide Since the adhesives system tem erature sensitive,use the follow- <br /> tippedbladeormasonrysawisrecommendedforcutting.To adjust the Y P <br /> Sealed Turbine Enclosure for the final burial depth,see section G11. Ing guidelines to mix and apply the adhesive based an the outside <br /> ambient temperature. <br /> When required for the FRP coupling,the recommended method for <br /> supplemental heat is a hand-held heat gun(maximum output temperature <br /> G5. Mounting Turbine Enclosure to 200°F) <br /> Collar When required for the turbine enclosure adhesive,the recommended <br /> method for supplemental heat is to transfer warm air to the turbine <br /> Prior to mounting the turbine enclosure to the collar,if necessary,rotate enclosure,while keeping ignition sources away.Typical heat sources <br /> the manway cover to align the tank fittings and submersible pump with include a salamander heater,radiant heater,etc.A heat gun(maximum <br /> the intended piping layout.Whenever the manway cover is removed, output temperature 200°F)can be used as supplemental heat,for the <br /> inspect the manway gasket for damage,and replace if necessary. turbine enclosure adhesive,it the outside temperature is at least 45°F. <br /> The turbine enclosure may be cemented in place using the optional WARNING:THE ADHESIVE MATERIALS AND VAPORS ARE FLAM- <br /> adhesive kit(kit-AD)supplied by O/C TANKS to prevent the ingress of MABLE.TO PREVENT FIRE OR EXPLOSION HAZARD,IFA HEAT <br /> water.The joint is not designed to store product. GUN(OR OTHER IGNITION SOURCE)IS USED FOR SUPPLEMENTAL <br /> HEAT,FIRST EVACUATE FLAMMABLE VAPORS WHICH MAY <br /> ACCUMULATE IN THE BOTTOM OF THE TURBINE ENCLOSURE. <br /> COLD AND COOL WEATHER(temperature less than 60°F) <br /> Toadjustforthe (Recommended methods include allowing the temperature of the <br /> burial depth,trim f adhesive to increase gradually In a warm room until the 65°•75° <br /> the top of thetur-2 I temperature is reached.) <br /> bine enclosure. —!I —Turbine Enclosure A.Before mixing,preheat the adhesive to 65-75°F temperature. <br /> B.Before applying the adhesive.add supplemental heat inside the <br /> assembled turbine enclosure to raise the temperature of the collar and <br /> ---------- enclosure to 60°F minimum,150°F maximum. <br /> • - C.Alter applying the adhesive,continue to apply supplemental heat to the <br /> I adhesive until it hardens 30 minutes minimum. <br /> 11 Sand and clean all ( ) <br /> joint areas prior to WARM WEATHER(temperature between 6l°F and 85°F) <br /> applying adhesive. A.Supplemental heat is not required.The an <br /> will harden in about 30 <br /> minutes. <br /> —Collar HOT WEATHER(temperature above 85-F) <br /> -ter A.Apply the adhesive more rapidly;it will harden in about 15 minutes. <br /> B.As an alternate,cool the adhesive to 60 OF to slow down the chemical <br /> reaction and increase the allowable application time. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.