Laserfiche WebLink
G6. Piping Connections 1311. Seale bine Enclosure <br /> Secondary piping can be connected to the tur a enclosure using the In high groundwater�ll6(tions,a sealed turbine enclosure is required to <br /> field-installed FRP coupling or rubber grommet:both are available from prevent water infiltration.The sealed turbine enclosure is mounted and <br /> 0/C TANKS as optional fitting kits. cemented to the tank collar using the same procedures described in sec- <br /> The rubber grommet provides acompression seat toprevent water run. tion G5.Also.the top of the sealed turbine enclosure is mounted and <br /> off from entering the turbine enclosure at the piping penetration, cemented in place. <br /> However,grommets are not recommended for high ground-water condi- Sealed turbine enclosures have factory-installed electrical fittings.if the <br /> tions.See section H3 for detailed installation instructions. sealed turbine enclosure is to be leak-tested using a standing water test, <br /> The FRP coupling provides a water-tight seal at the piping penetration for use seal-off fittings to make the electrical wiring connections leak-free. <br /> high groundwater conditions.See section H4 for detailed installation To adjust for the final burial depth,trim the bottom of the sealed turbine <br /> instructions. enclosure or the bottom of the fiberglass top before cementing in place. <br /> To minimize water infiltration in the turbine enclosure,FRP couplings or The sealed turbine enclosure must be isolated from direct traffic loading. <br /> grommets can be installed anywhere on the turbine enclosure provided Use 2"thick compressible foam board i x 4 1 on top of the sealed tu r- <br /> they do not interfere with the adhesive channel and are aligned radially to bine enclosure.The concrete traffic slab can be poured directly onto the <br /> the turbine enclosure center. compressible foam board.(See section Ft 1 for more details). <br /> A minimum 30"diameter(or 24"square)street box is required to remove <br /> FRP Coupling FRP Secondary Pipe Installed the oval lid onthe sealed turbine enclosureafter itisinstalled. <br /> Detail in Grommet Turbine Enclosure WARNING:DO NOT AIR PRESSURE TEST SEALED TU RBINE <br /> Exterior ENCLOSURE. <br /> Taper_` FRPSecondary <br /> i...`.."-' Containment Pipe Sealed Turbine Enclosure <br /> �-1 <br /> Turbine ._.\5�-__ ---FRP Tap <br /> Enclosure Exterior "� <br /> �i \_RubberGrommet <br /> r� a <br /> G7. Hydrostatic Water Test {6" ax. <br /> Turbine Enclosure <br /> Y Trim here-1 1 <br /> After the adhesive has cured,test the turbine enclosure to assure it is leak <br /> to adjust portions <br /> not trim `Reid <br /> tree.Fill the collar and turbine enclosure with 3"of water above the for final upper portions of Bonded Joint <br /> burial depth the turbine �j <br /> highest adhesive channel(or field-installed FRP coupling)and inspect the —r— enclosureor 9 <br /> outside of the joint and collar for leaks. , collar Detail <br /> 72^Max. <br /> A standing water testis an alternate test method.Monitor the water level �_�_ — — — t ��Secondary <br /> for 24 hours.If the water level is within Y4"after 24 hours,the system is - Containment Collar <br /> considered leak free. �, m <br /> G8. Electrical Connections <br /> t� Optional rubber grommets can also be used to field-install the electrical fit- <br /> bogs G12. Monitoring <br /> on the turbine enclosure(see section H3 for detailed installation <br /> instruction).However grommets are not recommended for high ground- All turbine enclosures must be equipped at the jobsite with an <br /> water conditions.The sealed turbine enclosure includes factory-installed optional electronic monitor to detect the accumulation of liquid in <br /> electrical fittings,which are water-tight for high groundwater applications. the collar.The monitoring sensor should be placed in a protective <br /> Electrical conduits are then connected to the threaded steel couplings.Four casing,which has been perforated.The casing is fastened to the sensor <br /> fittings are provided in the optional electrical fitting kit to accommodate wir- mounting bracket on the side of the turbine enclosure using a mounting <br /> ing to the submersible pump and optional monitoring sensor.All wiring con- clamp. <br /> nections must conform to local and national electrical codes. The optional 0/C TAN KS supplied pipe sump sensor(see section F 13)is <br /> already mounted inside a plastic casing and is supplied with the <br /> mounting clamp. <br /> G9. Install Polyethylene Top and Backfill If the monitoring sensor detects liquid in the collar,OIC TANKS <br /> After completing all piping and electrical piping connections,vanthe recommends that the power on the submersible pump be discon- <br /> final grade and trim the top of the turbine enclosure,if necessary.The netted.This can be performed automatically by providing an electrical <br /> polyethylene top is then placed over the turbine enclosure.This top is feedback circuit from the monitoring system to disengage the submersi- <br /> designed to prevent water runoff from entering the turbine enclosure ble pump(See section 04,Transmission Contact Switch for optional O/C <br /> After positioning the top,you should press down to seat the top onto the TANKS Control Panel), <br /> turbine enclosure.Then backfill to the turbine enclosure top. <br /> G13. Traffic Slab <br /> G10. Top Clearances Traffic areas require a rebar reinforced concrete road surface to span the <br /> The turbine enclosure must be isolated from direct traffic loading.After underground void created by the turbine enclosure. <br /> backfilling to the top of the turbine enclosure,place 11/4"of specified <br /> gravel and then 3/4"thick plywood(4'x 41 over the top to allow a 2" <br /> minimum clearance between the top of the turbine enclosure and bottom G14. Maintenance <br /> of the concrete pad,if the tank is located in a traffic area,the 9"thick traf- Use caution for normal maintenance or inspection of the submersible <br /> fic slab with extra rebar reinforcement can be poured directly onto the Use <br /> piping located in the turbine enclosure. <br /> plywood.This 2"clearance also provides a channel for water runoff. pump <br /> WARNING:FUEL VAPORS MAY BE PRESENT IN THE TURBINE <br /> ENCLOSURE.TO PREVENT FIRE OR EXPLOSION HAZARD,KEEP <br /> Isolate turbine enclosure from di rect traffic loading. ALL IGNITION SOURCES AWAY WHEN REMOVING THE PIPING <br /> SUMP LID. <br /> Reinforced concrete" <br /> e5 rebar 8"oc both ways <br /> Rebar mat must extend 24" G15. Future Periodic Testing <br /> 4feet inall terof risers street Box*',. Using the water test as described in section G7,leak test the tur- <br /> bine enclosure assembly at least once ayear. <br /> 2"minimum —HDPETop <br /> clearance <br /> 1 U4"gravel,then <br /> Plywood" —Turbine Enclosure <br /> "Contractor 48"x48"x�."Thick <br /> Supplied Items Collar <br /> 15 <br />