Laserfiche WebLink
Figure 4-1 Figure 42 <br /> Adhesivelolnt Layup Joint(Tapedl <br /> Tank Sump BuslY Visually Proportional –Tankwmp Body <br /> Adhesive- Adhesive <br /> EZ-Flt EZ-Ht Sand/Clean Ma N'wMhtape <br /> Adhesives Adhnive Matin95uAace muy 6eusedro <br /> channel Chmrel —111--w�� <br /> 1 sealJNnrgy <br /> 4i <br /> Channel Sand/Clean �L <br /> Mesh Mating j Surface <br /> Tank Sump/Collar Tankwmp/CdW <br /> Tank Sump/Collar Tankwmp/Crier &tenor^ Inlbbr <br /> Exterior~ Imeror <br /> 4.4.6. Allowadheshre to cure at least 5 hours without moving 45.2. The tank sump will be shipped with H-clips for <br /> thejolned parts.The surface of the adhesive should be positioning the body on the tanks'double-wall collar. <br /> hard;if not hard after 5 hours,wait up to 24 hours. With a two(2)piece tank sump,the top is shipped <br /> with 8 additional H-clips for positioning the tank sump <br /> HAND LAYUP JOINTS(KIT LIQ components. <br /> 4.5. KitContents:This kit is designed for Hand Layup Joints. 4.5.3. Double-wall tank sump hand layupJoints Include both <br /> interior and exterior layups. <br /> Box 1 of 2 453.1. 42'and 48'diameter tank sumps require one(1) <br /> It. Sizelayup kit for the interior layup and one(1)layup <br /> Dry kit for the exterior layup,totaling two(2)layup kits <br /> Pair Rubber Gloves K-Large i perjolnt <br /> Sandpaper 316'long 2 4592. 54'diameter tank sumps require two(2)layup kits <br /> Plastic Roller 06•x3' 1 for the interior layup and two(2)layup kits for the <br /> exterior layup,totaling four(4)layup kits per joint. <br /> Felt Roller Handle 3- 1 4.5.4. Thoroughly mix resin and catalyrt following the mixing <br /> Feh Roller Pad 3' 2 instructions in the layup kit. <br /> Chopped Strand Hbeglxss Mat 6'Wx33'1- 15 4S5. Resin coat previously ground mating surfaces on tank <br /> Wooden Mhdng Stkk 1 sump with felt roller. <br /> Bnx2of2 4.5.6. Apply 3 layers of fiberglass layup,saturated with resin, <br /> 3600 around tank sump,centered on joint All layup <br /> ItemsSize Joints must overlap a minimum ofl'but not exceed 2- <br /> �' in circumferential direction(see Figure 43). <br /> Mix Instruction Sheet(INST 6032) 1 Flgvre d-3 <br /> MIMS for Layup Kit Resin-Part A(ACC M1 S) 1 <br /> MSOS for Catalyst(Cadox L-SOA-MR) 1 (aYuPJomt <br /> Layup Kt Resin-PartA 1gaL I —Tank SumpBod/ <br /> Catalyst(pan B) 59nmtubes 20 <br /> 4.5.1. Dry fit all tank sump components prior to sealing } <br /> Joints,as outlined In Section 3. 4' Laserspl NLxvglaa <br /> sane/aeon <br /> 45.1.1. Gaps between two Joints greater than''A'must Mating Surface 3 W/Resin 3-pat <br /> be covered with maximum width ye'width pipe I Fid.Juin[Wit LK) <br /> to prevent resin from running Into joint <br /> (See Figure 42). 4• 3� <br /> Sand/Clean <br /> Mating sprfa<e <br /> J <br /> Tankwmp/Collar Tankwmp/CdNr <br /> Frterior Interior <br /> 5 <br />