My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOUBLE-WALL TANK SUMP INSTALLATION CHECKLIST <br /> For Fiberglass Tank sumps <br /> The tank sump installation Marklist,these instructions,and any co eponde ca releted to the talk sump installation mug be <br /> retained by the tank owner.Thisdleddist will be required and mug be provided to C9 when making awarady claim. <br /> site owrlu Cab MkrtaYllon <br /> Site Address <br /> Short City Bae Tip <br /> Insrallingcontractor <br /> Compary area aly Bale Zip <br /> Gn rplsEd <br /> 1. All tank sump components have been inspected for damage prior to installation. <br /> 2. All tank sump parts and components were handled and stored according to these instructions. <br /> 3. All have been prepared per these Instructions.(check one below) <br /> ❑EZ-Fit Adhesve,bints(KITAD) ❑Hand Layup.bints(KITIJn ❑Both <br /> 4. Date on Assembly Kit Box Date kit used <br /> 5. All joints were given a minimum of 5 hours to cure without parts being moved or disturbed. <br /> 6.Tank sump tops are properly protected from traffic load. <br /> 7. Approved backfill was used around and under the entire tank sump. <br /> S. Gaskets are lubricated,clean,and undamaged.Finned gaskets have fins pointing down. <br /> 9. Tank sump with FillNapor lid is oriented so that the reservoir opening is 90°from tank centerline. <br /> 10. All tank sump annular spaces were pressure/soap tested for tightness prior to backfilling. <br /> 11. If monitoring fluid was added to the annular space,confirm that the CSI MFFK kit was used. <br /> 12. Diameter and quantity of tank sumps installed and tested. <br /> ❑4Z' qty- ❑48"__qty. O 54" qty. <br /> Installatlonwas in accordamewhh most recent C511nstallation Insbvetlans pukt4 .INST"34. <br /> Owner Repreeallativa(Print Nene) Date Contractor Lbpresentalhe(Rant None) Dale <br /> OwnerFepresanatise(Bgnalm) Oontractor Rpres entatkre(agneture) <br /> CONTATaNMEN s <br /> 5150Js5ivn Dleniral Road Conroe,Tend; 3I8 <br /> rai:ms�s6rrJ1 Fac 93bT56]]% <br /> wwwmmainmenladutionsmm <br /> rb,"M CMTS WA9nmert Wr omlrc-At agMSRpmw]•Jme A15•NG M.IWSYsIG <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.