My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> 1868 E. Hazelton Avenue Linda Turkatle,REHS <br /> Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> - Robert McClellon,REHS <br /> ` -•y Jeff Carruesco,REHS,RDI <br /> Website: wwwsjgov.org/ehd Kasey Foley,REHS <br /> Phone: 209 468-3420 Rodney,REHS <br /> Fax: <br /> ( I Willy Ng,REHS <br /> Fax: (209) 468-3433 <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> INSTALLATION PERMIT <br /> San Joaquin County Environmental Health Department (EHD) has established the following guidelines to <br /> assist you in the completion of your construction project. The guidelines specify the construction and <br /> monitoring criteria necessary to complete our review of your proposed underground storage tank (UST) <br /> system. <br /> A. PLAN REVIEW GUIDELINES FOR NEW INSTALLATION OF UST's <br /> 1. An installation permit and payment of appropriate fees shall be required for the installation or <br /> modification of any underground storage tank system, which will be used for hazardous <br /> substances. <br /> 2. Contractors shall submit, or have on file with the local agency, information verifying that they <br /> possess a current State Contractor's License (A, B, C-36, or C-610-40), hazardous <br /> substance removal certification, and Workmen's Compensation Insurance. <br /> 3. The contractor shall be responsible for ensuring that conditions at the site provide for <br /> workplace safety, protection of the environment, and maintenance and integrity of nearby <br /> structures. <br /> 4. Under no circumstances shall any regulated material be placed into any underground tank <br /> system without approval of the EHD. <br /> 5. All tanks, piping, and equipment shall be installed and tested in accordance with the <br /> manufacturer's recommendations/guidelines. <br /> 6. All interstitial monitors must perform according to manufacturer's standards, and must be <br /> tested annually in accordance with section 2630 (d), California Code of Regulations (CCR), <br /> Title 23 Waters, Division 3, Chapter 16. <br /> 7. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br /> Air Pollution Control District, the County/City Building Department and the appropriate Fire <br /> District. <br /> 8. Applicant/contractor shall adhere to the approval plan and any change or deviation shall be <br /> reported to and approved by EHD prior to installation. <br /> 9. The application for installation of underground tanks is only valid for the calendar year in <br /> which it has been issued. A permit may be extended into the next calendar year if a letter is <br /> sent to EHD requesting this extension thirty days prior to the end of the calendar year. A one <br /> time, one year extension may be granted by EHD upon receipt of this letter. <br /> Revised 7/26/2016 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.