My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a result of a <br /> leaking UST system, it is the responsibility of the owner or operator to submit a work <br /> plan to EHD Site Mitigation Unit prior to initiating any assessment or remediation <br /> activities. <br /> b. To minimize delays, a Corrective Action Plan may be submitted concurrent with tank <br /> closure or installation plans. Address one copy of the Corrective Action Plan to the <br /> Site Mitigation Unit for review. For further assistance contact the Site Mitigation Unit <br /> at(209) 468-3450. <br /> B. PLAN REVIEW AND OPERATING PERMIT FEES <br /> 1. New facility plan review fee of $1,112.00 (8 hour minimum per facility). Also due at <br /> time of plan submittal: $583.00 facility fee, $139.00 per tank fee plus $15.00 state <br /> surcharge fee per tank. Facilities not already on inventory in a CUPA program have an <br /> additional $35.00 per site state surcharge. <br /> 2. New installation of an additional tank at an existing facility is $1,112.00 plan review fee <br /> (8 hour minimum per facility) plus $139.00 per new tank, and $15.00 per new tank <br /> state surcharge fee. <br /> 3. It should be noted that a $1,112.00 plan review check fee required for each submittal <br /> allows for up to eight (8) hours of staff review and/or inspection time. Additional time <br /> spent on plan review, meetings, inspections, phone or office consultations will be billed <br /> to the applicant at a rate of$139.00 per hour. <br /> 4. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> 5. If gross deficiencies are identified, the plans will be returned with a checklist identifying <br /> plan deficiencies. <br /> 6. To expedite the review of installation plans, time and a half per hour overtime fee may <br /> be submitted to have review completed within 10 working days of submittal date if staff <br /> is available to perform the review. <br /> Revised 7/26/2016 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.