My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'off. .. San Joaquin County DIRECTOR <br /> 2. Environmental Health Department Linda Turkatte,REHS <br /> 1868 E Hazelton Avenue ASSISTANT DIRECTOR <br /> Stockton, California 95205 Kasey Foley,REHS <br /> Cq••'�iZ"+�j�� PROGRAM COORDINATORS <br /> <<F OR Website: www.sjcehd.com Robert McClellon,REHS <br /> Phone: (209)468-3420 Jeff Carruesco,REHS,RD] <br /> Fax: (209)464-0138 Rodney Estrada,REHS <br /> Willy Ng,REHS <br /> November 8, 2017 FILE COP Y <br /> JR Beard <br /> LHB and Associates <br /> 867 Pacific Street, Suite 120 <br /> San Louis Obispo, CA 93401 Sent by Certified Mail <br /> RE: Chevron Gas Station, 1490 S Main Street, Manteca,CA 95337 SR0076222 <br /> The revised permit application to install an underground storage tank (UST) system at the above address <br /> was received by the San Joaquin County Environmental Health Department (EHD) on October 16, 2017 <br /> and on November 8, 2017. <br /> Please provide the following additional information (three copies each) and address the following <br /> comments, all revisions should be included in clouds or clearly identified using other methods: <br /> 1) Drawing FS-1 (and FS-7) identifies that an external audible visual alarm will be installed, however, <br /> flapper valves were identified on the revised permit application, please clarify. Also, provide the <br /> proposed drop tube calculations for the overfill flapper valves. <br /> 2) Drawing FS-6, please clarify concrete thickness around the under dispenser containments <br /> (UDCs). <br /> 3) On your sheets please identify the minimum pea gravel thickness to be installed between tank <br /> sumps and the concrete to prevent load transfer to the top of the tank(s). <br /> 4) Drawings FS-3, FS-4, FS-5 show that brine sump sensor reservoir will be mounted onto the sump <br /> wall. Per the submitted sump cut sheets, these sumps have built-in brine reservoirs and not the <br /> external sump reservoirs. Please clarify how these brine sensors will be installed inside STP <br /> sumps. <br /> 5) Drawing FS-6 identifies that a sump sensor port will be located at the top of the UDC, however, <br /> per the submitted Bravo cut sheet the brine sensor port connection is located at the bottom of the <br /> UDC, please clarify how UDC brine sensors will be installed and how brine communication will be <br /> verified inside the proposed UDC sumps. Please revise and resubmit. <br /> 6) On the revised drawings (for example FS-3 and FS4) it's unclear if the proposed sumps are VPH <br /> compliant, for example, no VPH shroud boots and clamps are illustrated or identified (refer to the <br /> attached illustration). Per the EHD permit application (page 4), "detail of sumps and under- <br /> dispenser containment to demonstrate vapor tightness" and "detail of system that demonstrates it <br /> is impervious to water intrusion" must be provided. Please revise and resubmit. <br /> 7) Drawing FS-7 (diagram 2) indicates that vent sump penetrations will be factory installed (3" <br /> fiberglass cuff entry (factory installed)"for the proposed 2"vent line. Also, no means to verify brine <br /> communication (like a sight glass) was illustrated on the proposed drawings for the vent sump. <br /> Please revise and resubmit. <br /> 8) On the revised drawing FS-12 (received on 11-8-2017) vapor recovery line leading to the 91 STP <br /> was removed. Please revise all respective sheets where it's shown (for example FS-1, FS-3, etc.), <br /> Please revise and resubmit. <br /> Page I of 2 1490 S main Street, Manteca, CA C00076222 <br /> 9171 9690 0935 0151 6824 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.