My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9) On drawing FS-12, identify the calculated vacuum zone volumes to confirm that each proposed <br /> zone (for 3" and 4" piping) will be less than 500 gallons. Please provide a list of all vacuum zones <br /> and sensor numbers that will be utilized to motor these zones. Please revise and resubmit, as <br /> appropriate. <br /> 10) On drawing FS-12 (20,000 gallon tank), it appears that the 87 product and the vapor recovery <br /> piping is connected outside the STP sump. Please revise and resubmit. <br /> 11) On drawing FS-12, the note in the upper left corner (3-way valve mounting detail) still indicates <br /> that a 'N' vacuum tubing from tank annular" will be installed; brine monitored tanks were <br /> proposed. Please clarify and revise as appropriate. <br /> 12) The Buoyancy Calculations (20,000 Gallon tank) on page FS-3 has an addition error in the total <br /> tank uplift calculation. It is shown that 166,436 LBS + 6,271 LBS = 176,486 LBS. Tank length is <br /> given as 38'-2 3/4" and it appears that in the hold down calculations 37.5' was used for the <br /> calculations. Please verify that math calculations are correct and that correct measurements are <br /> being used. Revise as appropriate and resubmit. <br /> If you have any questions, don't hesitate to call me at (209) 953-7699 or Cesar Ruvalcaba at (209) 953- <br /> 6213. <br /> Thank you, <br /> ElenaMzo, Sr. REHS <br /> Sr. Registered Environmental Health Specialist <br /> CL (�ur�ree+ Sunol�+ � <br /> ,?g23 E. S-3ari',jj IerracC <br /> [A 945"68 <br /> Page 2 oft 1490 S main Street, Manteca, CA C00076222 <br /> 9171 9690 0935 0151 6824 59 <br />