My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO 2013 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:18 PM
Creation date
11/8/2018 9:41:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2015
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\3440\PR0231173\COMPLIANCE INFO 2013 - 2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> JUL 31 2014 <br /> F. In-Tank Gauging/SM Equipment., ® Check this box if tankau in is 4J I <br /> g g g <br /> ❑ HEALTH <br /> Check this box if no tank gauging or SIR equip pmlj' <br /> -tank gauging equipment is used to perform leak detection moaitorin <br /> This section trust be complcicd if in t +1 <br /> Complete the following checklist: <br /> Cl Yes D leo* Bas all input wiring heen inspected for proper entry and termination,including testhig for ground faults? <br /> ❑ Yes ❑ No* Were all tank gausiug probes visually inspected for damage and residue buildup? <br /> Q Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No*" Was accuracy of system water level readings tested? <br /> O Yes El No* Were all probe,,,reinstalled properly? <br /> ❑ Vcs ❑ Nos Were all items on the equipmen[manufacturer's maintcnanec checklist completed? <br /> "la the Section K below,describe how and when these deficiencies were or will be currected. <br /> G. Line Leak Detectors (LLI)): r,) Check this box if LLus are not installed. <br /> Com lete the folio Ing checklist: <br /> ® Yes D No For equipmeat start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Q NIA (Check all(hat apply) Simulated leak rate: ®3 g.p.h_ ❑0.1 g•p.h; ❑4.2 g.p.h. <br /> ® Yes ElNo* Were all LLDs confirmed operational and accw-afe within regulatory requirements? <br /> Ycs 0 tie* Was the testing apparatus property calibrated? <br /> [ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes .0 No* For electronic LLDs,does the turbine automatically abut of}'if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LJ..17s, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 NIA or discurmected? <br /> D Yes D No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 0 VA or fails a test? <br /> 1❑ Yes O No* For electronic LLDs,have all acecssible wiring connections been visuslly inspected? <br /> ® NIA <br /> ® Yrs D No* Wen all items on the equipment manufacturer's maintenance checklist completed? <br /> *10 the Section FI,below;describe how and when these deficiencies were or will be corrected. <br /> H. Comments: The �swer�testeaou Z11.4I201atc�c:otxtpletexnorntodng�e�ti �cspecm�. <br /> Jett Wring on site _-- <br /> Page 3 of 4 <br /> t7d E9699V960Z wnelotled elge1le�:l eZ 6:90 t 1 LZ Inf <br />
The URL can be used to link to this page
Your browser does not support the video tag.