Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> is ip TanlvTok)W <br /> TEST DATE:12/16/99 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER2210724 <br /> CLIENT:ULTRANF_R INC AUSTIN,TEXAS 78757(512)451-6334 SITE:ULTRAMAR 492 <br /> ' TANK INFORMATION: . <br /> Tank ID: 92 2 Tank manifolded: NO Bottom to top fill in inches: 133.0 <br /> Product: SUPER Vent manifolded: YES Bottom to grade in inches: 141.0 <br /> Capacity in gallons: 1,410 Vapor recovery manifolded: YES Fill pipe length in inches: 37.0 <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 344 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DN STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST RESULTS Test Method:yiacuTect: '.. .LEAK DETECTOR TESTAESULTS Test methGEt?.€ -V- <br /> Start(in) End(in) <br /> Dipped Water Level: New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Product Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Probe Water Level: Make: RED JACKET <br /> Ingress Detected: Water Bubble Ullage Model: Fx <br /> Test time: S/N: 407981610 <br /> Inclinometer reading: Open time in sec: 4.00 <br /> Holding psi: 12 <br /> VacuTect Test Type: NOT Resiliency cc: 1ao NOT <br /> VacuTect Probe Entry Point: TESTED <br /> Test leak rate ml/m: 189.0 TESTED <br /> Pressure Set Point: Metering psi: 10 <br /> Tank water level in inches: Calib. leak in gph: 3.00 <br /> Water table depth in inches: Results: FASB <br /> Determined by(method): <br /> Result: <br /> COMMENTS <br /> COMMENTS <br /> 'k 11NETEST.RESULTS n Testtype.„�D 1 <br /> Material: DN FIBERG <br /> Diameter(in): 2.0 <br /> Length (ft): 40.0 <br /> Test psi: so <br /> Bleedback cc: 75 <br /> Test time (min): 30 NOT NOT NOT <br /> Start time: 09:50 TESTED TESTED TESTED <br /> End time: 10:20 <br /> Final gph: 0.009 <br /> Result: PASS <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Draft 12/17/1999 13:42 MSHAW <br />