Laserfiche WebLink
INDIVIDA TANK INFORMATION AND EST RESULTS <br /> _'i TankrK* gY <br /> 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER: 2220097 <br /> TEST DATE: 12/27/01 AUSTIN,TEXAS 78757(512)451-6334 <br /> CLIENT: ULTRAMAR INC SITE: ULTRAMHR 492 <br /> Tank ID: 87 1 Tank manifolded: NO Bottom to top fill in inches' 134.0 <br /> Product: UNLEADED Vent manifolded: YES Bottom to grade in inches: 141.0 <br /> Capacity in gallons: 14,130 Vapor recovery manifolded: yEs Fill pipe length in inches: 38.0 <br /> Diameter in inches: 96.00 Overfill protection: yES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 337 Overspill protection:yEs Stage I vapor recovery: DUAL <br /> Material: Dw STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> STPISU 47P M, <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JACKET <br /> Fluid volume in gallons: Model: mnv <br /> Tank water level in inches: S/N: 407981440 <br /> Test time: NOT Open time in sec: 3.00 <br /> Number ofthermisters: TESTED Holding psi: is NOT <br /> Specific gravity: Resiliency cc: 120 TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 10 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> %use pe:,,, / •;, <br /> 1111111 IS <br /> Testtime: Material. DW EIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Length (ft): 40.0 <br /> Ullage pressure: <br /> RTest psi: <br /> esults: <br /> Bleedback cc: <br /> Test time (min): <br /> DATA FOR UTS4T ONLY: Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: <br /> Test 2:Start time: TESTED TESTED TESTED TESTED <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change Go: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational:UMCNOWN <br /> Printed 01/07/2002 13:15 CCHAPA <br />