Laserfiche WebLink
3 <br /> SWRCB,January 2002 Page3 Of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: O Sump Manufacturer tffi.Industry Standard O Professional Engineer <br /> O Other(Specify) <br /> Test Method Used: O Pressure O Vacuum Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: 1 N 6O Equipment Resolution: _0,0 0 Z- <br /> Sump# 8 } Sump# q Sump# Sump# <br /> Sump Diameter: le y 21 1 <br /> Sump Depth: 9 h <br /> Sump Material: G5s dSS <br /> Height from Tank Top to Top of Z <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration 20 20 �� <br /> Condition of sump prior to testing: /- © - <br /> Portioaof Sump Tested' Q C <br /> Does turbine shut down when <br /> sump sensor detects liquid(both OA Yes O No O NA b`-Yes ONO DNA Dyes ONO [INA O Yes ONO O NA <br /> product and water)? <br /> ater ?` <br /> Turbine shutdown response time g $ec r S eC <br /> Is system programmed for fail-safe <br /> shutdown?` 14 Yes O No O NA des O No O NA O Yes O No O NA O Yes O No DNA <br /> Was fail-safe verified to be <br /> operational?* QLYes O No O NA Z*Ss O No DNA O Yes O No O NA O Yes O No [INA <br /> Wait time between applying <br /> pressure/vacuum/water and starting Sh 1 n <br /> test: l SYrt�'n <br /> Test Start Time: <br /> Initial Reading(Ri): A 1 .S 36 0 <br /> Test End Time: 1,WCO L <br /> Final Reading(RF): <br /> Test Duration: h�./ <br /> Change in Reading(Rt-RJ: F Q, dw y <br /> Pass/Fail Threshold or Criteria: 't' 0 , C,3 z- t 0 . 007- <br /> ,.AY- ass <br /> on7- <br /> Yass O Fail Pass O Fail 0;,Pass ❑Fail :P Pass OFail <br /> Was sensor removed for testing? KYes ❑No G NA KYes ❑No ❑NA ❑Yes ❑No ❑NA O Yes ❑No DNA <br /> Was sensor properly replaced and <br /> verified functional after testing? X-Yes O No O NA l--Yes ❑No ❑NA O Yes O No O NA ❑Yes O No ❑NA <br /> Comments -(include information on repairs made prior to testing and recommended follow-up for ailed tests) <br /> t If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />