Laserfiche WebLink
SWRCB,January 2002 Page Lt of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ?%dustry,Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: Wressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: <br /> FV-61-ed Equipment Resolution: <br /> Piping Run# Piping Run# Z Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: L s <br /> Piping Diameter: " 3 c. <br /> Length of Piping Run: c 0 c <br /> Product Stored: u n <br /> Method and location ofQr` '5sur rc�l A- r cswn � u1" <br /> piping-run isolation: "ro ih;nc S , rb i S <br /> Wait time between applying <br /> pressure/vacuum/water and t -" t--kN 1�— VYt ✓� <br /> starting test: <br /> Test Start Time: <br /> Initial Reading (Ri): i S i <br /> Test End Time: S . <br /> Final Reading(RF): ur S i j <br /> Test Duration: <br /> Change in Reading(RF-&): <br /> Pass/Fail Threshold or /e <br /> Criteria: Y' <br /> _; Pass., Q FaPass p Fa0 Pass Fail <br /> p 7PaSs <br /> COlilmentS—(include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />