Laserfiche WebLink
10 <br /> Executive Order G-70-164,Exhibit 2,page 3 <br /> Air to Liquid Ratios <br /> Flow Rate (qpm) Minimum Ratio Maximum Ratio <br /> 6 1.40 2.40 <br /> 8 1.40 2.30 <br /> 10 1.40 2.15 <br /> NOTES: <br /> a. The Husky V34 6200-8 nozzle requires a special A/L adapter that will encompass all of <br /> the vapor recovery holes; however, test results have indicated that a special A/L <br /> adapter is not necessary if the single top hole is covered for the A/L test (refer to <br /> Figure 2C-3). <br /> b. This test procedure returns air rather than vapor to the storage tank, and may cause an <br /> increase in storage tank pressure and/or affect process unit operation. Temporary <br /> conditions which are attributable to the test are not to be considered an indication of <br /> malfunction or noncompliance. <br /> 2. No dispensing shall be allowed when the collection unit is disabled for maintenance or for <br /> any other reason unless the facility is operating under a district variance or <br /> upset/breakdown rule provision. <br /> 3. The maximum number of fueling points which can be supported by one collection unit is <br /> sixteen (16). This is based on an in-use factor of fifty percent (50%) and a demonstration <br /> of eight nozzles dispensing 7.5 gallons simultaneously with an A/L ratio greater than 1.4. <br /> Additional fueling points require an additional collection unit (one per sixteen additional <br /> fueling points). <br /> 4. OSHA-approvable access to the collection unit shall be provided immediately upon <br /> request for maintenance, inspection and/or testing. <br /> 5. The local district may require the installation of a tap at least 1/8" NPT be provided on the <br /> inlet and outlet side of the collection unit. The taps.shall remain plugged and vapor tight <br /> except when test equipment is being connected or removed, and air ingestion and/or vapor <br /> loss associated with connecting or removing test equipment shall be minimized. The <br /> vacuum level at the inlet of the collection unit can be adjusted by changing the size of the <br /> by-pass orifice. The normal operating level at this point shall be minus 30 to 40 inches <br /> water column. <br /> Note: Changing the length of the hoses or the number of installed nozzles may affect the <br /> vacuum level and require adjustment of the by-pass orifice. <br /> Processing Unit (burner) <br /> 1. The Hasstech VCP-3A Processing consists of an inline flame arrestor, an inline pressure <br /> switch, a solenoid activated vapor valve, another flame arrestor, and a single stage burner <br /> assembly with electronic ignition and a flame detector (refer to Figure 213-1). <br />