My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 1:58:38 PM
Creation date
11/8/2018 9:41:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 5.9 Leak Detection Solution. Any liquid solution designed to detect vapor leaks <br /> may be used to verify the pressure integrity of system components during <br /> this test. <br /> Figure 3-3 <br /> Vapor Coupler Test Assembly <br /> POPPET ACTUATION PRESSURE GAUGE <br /> PROBE - <br /> u <br /> i <br /> GASKET / <br /> BLEEDER VALVE AND <br /> QUICK CONNECT FITTING I <br /> I <br /> 6. Pre-Test Procedures <br /> 6.1 The following safety precautions shall be followed: <br /> 6.1.1 Only nitrogen shall be used to pressurize the system. <br /> 6.1.2 A one psig relief valve shall be installed to prevent the possible <br /> over-pressurizing of the storage tank. <br /> 6.1.3 A ground strap should be employed during the introduction of <br /> nitrogen into the system. <br /> 6.2 Product dispensing shall not occur during the test. There shall have been <br /> no Phase I deliveries into or out of the storage tanks within the three hours <br /> prior to the test. <br /> G-70-164 Exhibit 3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.