Laserfiche WebLink
Designated Operator (DO) Employee Training <br /> Site Number: DO Name & Certificate No.• aP 6 3,75(8777_ [/C <br /> Site Address: <br /> • Designated UST Operator's Primary Responsibilities <br /> 1. Monthly visual inspections of the UST facility <br /> 2. On-the-job training for "facility employees" every twelve months, starting July 1, 2005. <br /> Employees hired on or after July 1, 2005 must be trained within 30 days of their date of hire. <br /> • DO Employee Training Topics <br /> 1. Understanding UST System Com onents and Operations <br /> A. Tank information for the site: Size, Material, installation date, and type <br /> B. Overfill and spill protection: Turbine sumps, spill buckets, and under-dispenser containments <br /> C. Piping: Material, types and installation date <br /> D. Site Plot Plan—Locations of UST systems (HMMP) <br /> 2. Understanding Leak Detection Svstem(s) <br /> A. UST leak detection methods (e.g., ATG, SIR, CSLD, or CM) and devices (e.g., Interstitial <br /> Monitoring), product piping leak detection, sensors in the sumps. <br /> B. Types and functions of leak detection systems (e.g., electronic or mechanical) <br /> C. Tank Testing Results, Inventory Reconciliation and Daily & Monthly Inspection Checklists <br /> 3. Responding to System Alarms <br /> A. Difference between an alarm and a system failure (Delivery Needed & Fuel Alarms) <br /> B. Emergency Contact Information—SolvOne or Regional HSE Specialist <br /> C. Alarm Log Update <br /> 4. Spill & Leak Response <br /> A. Spill/Overfill Response Procedure <br /> B. Spill response equipments <br /> C. Emergency Shut-off Button <br /> D. Disposal of Waste <br /> JE,miame Si ture Date Em to ee Name Si na rc Date <br /> N <br /> -- ffM TA , THIS F NDER ENVIRONMENTAL RECORD BOX TAB#4 <br /> TO 39VJ £T£T 3HOiS Sdn 3Hi £T8TVLVGOZ ZT :£T 900Z/£0/TT <br />