My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Operator (DO) Employee Training <br /> Site Number: DO Name & Certificate No.• aP 6 3,75(8777_ [/C <br /> Site Address: <br /> • Designated UST Operator's Primary Responsibilities <br /> 1. Monthly visual inspections of the UST facility <br /> 2. On-the-job training for "facility employees" every twelve months, starting July 1, 2005. <br /> Employees hired on or after July 1, 2005 must be trained within 30 days of their date of hire. <br /> • DO Employee Training Topics <br /> 1. Understanding UST System Com onents and Operations <br /> A. Tank information for the site: Size, Material, installation date, and type <br /> B. Overfill and spill protection: Turbine sumps, spill buckets, and under-dispenser containments <br /> C. Piping: Material, types and installation date <br /> D. Site Plot Plan—Locations of UST systems (HMMP) <br /> 2. Understanding Leak Detection Svstem(s) <br /> A. UST leak detection methods (e.g., ATG, SIR, CSLD, or CM) and devices (e.g., Interstitial <br /> Monitoring), product piping leak detection, sensors in the sumps. <br /> B. Types and functions of leak detection systems (e.g., electronic or mechanical) <br /> C. Tank Testing Results, Inventory Reconciliation and Daily & Monthly Inspection Checklists <br /> 3. Responding to System Alarms <br /> A. Difference between an alarm and a system failure (Delivery Needed & Fuel Alarms) <br /> B. Emergency Contact Information—SolvOne or Regional HSE Specialist <br /> C. Alarm Log Update <br /> 4. Spill & Leak Response <br /> A. Spill/Overfill Response Procedure <br /> B. Spill response equipments <br /> C. Emergency Shut-off Button <br /> D. Disposal of Waste <br /> JE,miame Si ture Date Em to ee Name Si na rc Date <br /> N <br /> -- ffM TA , THIS F NDER ENVIRONMENTAL RECORD BOX TAB#4 <br /> TO 39VJ £T£T 3HOiS Sdn 3Hi £T8TVLVGOZ ZT :£T 900Z/£0/TT <br />
The URL can be used to link to this page
Your browser does not support the video tag.