Laserfiche WebLink
Onitoring System Certification • <br /> Site Address: 1206 E MARCH LANE Date of Testing/Service: 05/05/2006 <br /> F. In-Tank Gauging / SIR Equipment E] Check this box if tank gauging is used only for inventory control. <br /> Ej Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Q Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> E Yes ❑No` Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes ❑No• Was accuracy of system product level readings tested? <br /> Eyes ❑NoWas accuracy of system water level readings tested? <br /> M Yes ❑No' Were all probes reinstalled properly? <br /> Eyes I ON.• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> .In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No ON/A (Check all that apply)Simulated leak rate: 0 3 g.p.h O 0.1 g.p.h ❑0.2 g.p.h <br /> x Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes ONO' Was the testing apparatus property calibrated? <br /> O Yes E]No` ❑N/A For mechanical LLDs,does the LLD restrict product Now if it detects a leak? <br /> E]Yes ❑NO' ❑x N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Yes —]No Q N/A For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system is disabled or disconnected? <br /> E]Yes ❑No• x❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> O Yes ❑No• Q N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> OX Yes ❑No- Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> replaced 1 vaporless Id2000 on diesel tank <br /> Page 3 of 3 Based on CA form dated 03/01 <br />