Laserfiche WebLink
0nitoring System Certification • <br /> Site Address: 1206 E MARCH LANE Date of Testing/Service: 05/05/2006 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> M Yes No' Is the audible alarm operational? <br /> ❑Q YesPNo <br /> Is the visual alarm operational? <br /> ❑x ves Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> Q Yesinterfere with their proper operation? <br /> LLves X N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> x❑ Yes ❑N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) 0 Sump/rrench Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0 Yes ❑No <br /> Q YesNo' NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> property? If so,at what percent of tank capacity does the alarm trigger? so % <br /> ❑x <br /> Yes' ❑No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes' ENO Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> 0 Yes ❑No• Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> 0 Yes E]No• Is all monitoring equipment operational per manufacturers'specifications? <br /> 'In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA forth dated 03/01 <br />