Laserfiche WebLink
SWRCB,January 2002 0 0 Page 3 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: E] <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ❑ Pressure Vacuum Hydrostatic <br /> F] Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 3 Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 14 <br /> Bucket Depth: 8 <br /> Wait time between applying <br /> pressure/vacuum/waterand 30 <br /> starting test: <br /> Test Start Time: 0 94 0 <br /> Initial Reading(RI ): 4 <br /> Test End Time: 1040 <br /> Final Reading(RF ): 4 <br /> Test Duration: 1 hr <br /> Change in Reading(R F-Rt ) 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Pass Fail Pass. Fail Pass Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />