My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• _— •_ Page_2 of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer I@ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ®Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"Hg Vacuum <br /> Tank# " Tank# J / Tank# _U/e<fe Tank# <br /> Is Tank Exempt From Testing?' ❑Yes ❑No ❑Y s ❑No ❑ Y ❑No ❑Yes ❑No <br /> Tank Capacity: GALLONS • GALLONS )C GALLONS GALLONS <br /> Tank Material: <br /> Tank Manufacturer: <br /> Product Stored: ,Lt$o 1-t1114t-- bit t 3 t t- <br /> Wait time between applying <br /> pressurelvacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RD: "HG /l) "HG /0 - HG " HG <br /> Test End Time: ! :�C> <br /> Final Reading(RF): "HG 2 "HG— f jd "HG "HG <br /> Test Duration: our our 1 Hour 1 Hour <br /> Change in Reading(RF-RO: "HG - HG " HG "HG <br /> Pass/Fail Threshold or Criteria: Zero Zero Zero' Zero <br /> Test Results Pass ❑ Fail A Pass " P Fait � 3 <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA <br /> Was sensor properly replaced and [I Yes [I No El NA ❑Yes [I No [INA ❑Yes [I No [INA ❑Yes [I No [INA <br /> erified func <br /> vtional after testin ? <br /> Comments (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br /> Conoco Phillips - #2705445 <br /> 1206 E March Lane <br /> Stockton, CA. 95207 <br /> N041175 — SB989 Testing <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.