My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Page of <br /> • -&—SRCONDARX-PIPE-TFSTING- _ -- <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ®Pressure ❑ <br /> Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE <br /> Equipment Resolution:0 to 15"Psi <br /> Piping Run#�6 Piping Run# % Piping Run# /beeS, Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: l wel'O <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: L t <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: 0 0 <br /> Test Start Time: 7 y� �� 5 PSI <br /> Initial Reading(RJ: 5 PSI 5 PSI 5 PSI <br /> Test End Time: ! 5-c' <br /> Final Reading(R <br /> PSI PSI PSI PSI <br /> F): <br /> 1 Hour 1 Hour 1 Hour 1 Hour <br /> Test Duration: PSI <br /> Change in Reading(AFRI: PSI PSI <br /> PSI <br /> Pass/Fail Threshold or Zero Zero Zeroes Zero <br /> Criteria: <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Conoco Phillips - #2705445 <br /> 1206 E March Lane <br /> Stockton, CA. 95207 <br /> N041175 —SB989 Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.