Laserfiche WebLink
• Page—J--u: <br /> —6—PIPING SUMP TESTING--- — <br /> Test Method Developed By: ❑ Sump Manufacturer S Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum S Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# 7 Sump# / Sump#/_)iC5 e L Sump# <br /> Sump Diameter. <br /> Sump Depth: <br /> y7 ` <br /> Sump Material: 474e/- ASS <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: 600 <br /> Tested' 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Portion of Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No S NA ❑Yes ❑No SNA ❑Yes ❑No SNA ❑Yes ❑No S NA <br /> product and water)?* <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe []Yes ❑No SNA ❑Yes ❑No S NA ❑Yes ❑NO S NA (-]Yes ❑No S NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No S NA ❑Yes ❑No S NA ❑Yes ❑No S NA ❑Yes ❑No S NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Min'tites 15 Minutes <br /> test: <br /> Test Start Time: <br /> Initial Reading(RD: / E 7/1-4-8 _'bf z 7 <br /> Test End Time: /� �' ��I` 11.ea <br /> Final Reading(RF): 6,812-7 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-Ri): WV01-1 COi'�e at+C�n <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Test Result: 91 Pass ❑Fail ®.Pass E]Fail 19 Pass E] Fail ❑ Pass E] Fail <br /> Was sensor removed for testing? C]Yes [INo ❑NA ❑Yes ElNo 11NA ❑Yes El No El NA [I Yes [3 No [INA <br /> Was sensor properly replaced and ❑Yes ❑No ElNA ❑Yes 11No ❑NA [IYes ElNo ElNA [IYes ❑No ❑NA <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Conoco Phillips - #2705445 <br /> 1206 E March Lane <br /> Stockton, CA. 95207 <br /> N041175 — SB989 Testing <br />