My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Title 23, 2638(a) Monitoring equipment certification not performed annually. All <br /> monitoring equipment used to satisfy the requirements of this article shall be installed, <br /> calibrated, operated and maintained in accordance with manufacturer's instructions, and <br /> certified every 12 months for operability, proper operating condition, and proper <br /> calibration. Written records shall be maintained as required in section 2712. <br /> 4 Annual monitoring system certification was last performed on June 6, 2011, and <br /> was due by June 2012. Testing has not been done and is five months past due. <br /> Title 23, CCR 2712(b) Maintenance and monitoring records not maintained on site <br /> for at least three years. Written monitoring and maintenance records shall be <br /> maintained on-site or off-site at a readily available location, if approved by the local <br /> agency, for a period of at least 3 years, 6 1/2 years for cathodic protection maintenance <br /> records, and 5 years for written performance claims pertaining to release detection <br /> systems, and calibration and maintenance records for such systems. Records of repairs, <br /> lining, and upgrades shall be maintained on site or at another approved location for the <br /> remaining life of the underground storage tank. These records shall be made available, <br /> upon request within 36 hours, to the local agency or the State Water Board. Monitoring <br /> records shall include: <br /> (1) The date and time of all monitoring or sampling; <br /> (2) Monitoring equipment calibration and maintenance records; <br /> (3) The results of any visual observations; <br /> (4) The results of all sample analysis performed in the laboratory or in the field, including <br /> laboratory data sheets and analysis used; <br /> (5) The logs of all readings of gauges or other monitoring equipment, ground water <br /> elevations, or other test results; and <br /> (6) The results of inventory readings and reconciliations. <br /> 4 During the June 29, 2012, UST inspection, these records were not available on <br /> site for review and have not been made available. <br /> Title 23, 2712(1) Monitoring plan, response plan, and/or operating permit and all <br /> conditions not on site. A copy of the permit and all conditions and attachments, <br /> including monitoring plans, shall be retained at the facility. <br /> 4 During the June 29, 2012, UST inspection, these records were not available on <br /> site for review. <br /> Title 23, CCR 2715(c) Designated operator monthly inspection. The designated <br /> UST operator(s) shall perform monthly visual inspections of all underground storage tank <br /> systems for which they are designated. The results of each inspection shall be recorded <br /> in a monthly inspection report. The monthly visual inspection shall include, but is not <br /> limited to, the following: <br /> (1) Reviewing the alarm history report or log for the previous month, and checking that <br /> each alarm condition was documented and responded to appropriately. A copy of the <br /> alarm history report or log, along with documentation describing action taken in <br /> response to any alarm(s), shall be attached to the monthly visual inspection record. <br /> (2) Inspecting for the presence of hazardous substance, water, or debris in spill <br /> containers. <br /> (3) Inspecting for the presence of hazardous substance, water, or debris in under- <br /> dispenser containment areas, and checking that the monitoring equipment in these <br /> areas is located in the proper position to detect a leak at the earliest possible <br /> opportunity. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.