My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_PLAN 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
REMOVAL_PLAN 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:21:15 PM
Creation date
11/8/2018 9:43:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
PLAN 1991
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\REMOVAL PLAN 1991.PDF
QuestysFileName
REMOVAL PLAN 1991
QuestysRecordDate
11/16/2011 8:00:00 AM
QuestysRecordID
178257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' A complete IT approved first-aid kit will be readily <br /> available on-site. <br /> • If a serious injury occurs, the local emergency <br /> response team will be summoned to tend to and evacuate <br /> the injured person, as necessary. <br /> 1 Fire extinguishers will be on-site in work vehicles . <br /> In the event of an emergency, these extinguishers will <br /> ' be ready for the workers' safety and protection. <br /> Site Drilling <br /> Site drilling will comply with the following rules : <br /> • Before drilling or excavating, the existence and <br /> location of underground pipe, electrical equipment, <br /> and gas lines shall be determined. This will be done <br /> t by contacting Underground Service Alert (USA) at least <br /> 48 hours in advance of subcontractor arrival, to mark <br /> the location by use of appropriate device, such as a <br /> flux-gate magnetometer, to locate ferrometallic <br /> underground lines . <br /> • Drill equipment operators and helpers in proximity to <br /> ' the drilling equipment will wear a full complement of <br /> protective gear. Wearing of all PPE including safety <br /> glasses, gloves and hard hats is mandatory. <br /> Heavy Equipment Operation and Heavv Materials Handling <br /> ' The following procedures will be established around heavy <br /> equipment such as backhoes and drill rigs and during handling of <br /> heavy materials : <br /> • Hard hats and vests are to be worn at all times on- <br /> site . Other protective gear as specified in the <br /> ' health and safety plan is also applicable. <br /> • Safe distances must be maintained from underground or <br /> ' overhead power lines, sewer lines, gas lines, <br /> telephone lines, or power lines that present a hazard <br /> in the work area. <br /> t Operators of trucks and heavy equipment used on-site <br /> will be properly trained in the inspection and <br /> operation of such equipment . The site supervisor will <br /> ' be responsible to check the proficiency of the <br /> operator. <br /> A-25 <br /> MA:ENG:9262-AppA/041291 <br />
The URL can be used to link to this page
Your browser does not support the video tag.