Laserfiche WebLink
D. Results of TestlrlglServioing <br /> Software Version lnstalled:VR 1.01 <br /> Complete the following checklist: <br /> X Yes ❑ No' Is the audible alarm operational? <br /> X Yes ❑ No' Is the visual alarm operational? <br /> X Yes D hW Were all sensors visually inspected,tuncbonaBy tested,and cerlfirmed operational? <br /> X Yes El No' Ware all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with tlleir <br /> proper operation? <br /> ❑ Yes ❑ No' If alarms am relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X WA <br /> X Yes NW For pressurized piping systems, does the turbine automatically shut down it the piping secondary containment monitoring system <br /> WA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> X Sump/Trench Sensors; X Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failureldisconnection? X Yes; No. <br /> X Yes - No' For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br /> WA valve is installed),is the overfill waming alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm R 95 b <br /> ❑ Yes' X No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and fist the <br /> manufacturer name and model for all replacement parts in Section E,below- <br /> ❑ Yes• X No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) r-Product; -" Waterif <br /> s,describe causes in Section E,below. <br /> X Yes ❑ No` Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes No' Is all monitoring equipment operational per manufacturer's specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments THE RELAY FOR THE UNLEADED STP WAS `;TUCK IN THE OPEN POSITION AND THE TURBIN WOULD NOT <br /> SHUT DOWN THE REALM WAS REPLACED BUT THE TEST WAS DELAYED FOR TROUBLE SHOOTING AND REPAIRS <br /> - <br /> L 2 DISP 1-2 ANNULAR[MODLE VR 304 X PASS <br /> L4 DISP 3-4ANNULAR [MODLE VR 304 X PASS <br /> L6 DISP 5-6 ANNULAR[ MODEL VR 304 X PASS <br /> L 8 DISP 7-8 ANNULAR[MODLE VR 304 X PASS <br /> L 10 DISP 9-10 ANNULAR[MODEL VR 304 ___X PASS <br /> L 12 DISP 11-12 ANNULAR[MODLE VR 304 X PASS <br /> L 13 VENT DOX[MODLE VR 208 X PASS <br /> L 14 VENT BOX ANNULAR[MODEL VR 304 X PASS <br /> L 16 87 STP SUMP ANNULAR[MODEL VR 304 X PASS <br /> L 18 87 FILL SUMP ANNULAR[MODLE VR 304 X PASS <br /> L 20 91 STP SUMP ANNULAR[MIDDLE VR 304 X PASS <br /> L 22 91 FILL SUMP ANNULAR[MODLE VR 304 X PASS <br /> L 24 DIESEL STP SUMP ANNULAR[MODLE VR 304 X PASS <br /> L 26 DIESEL FILL SUMP ANNULAR[MODLE VR 304 X PASS <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 <br />