Laserfiche WebLink
F. In-Tank Gauging f SIR Equipment X Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com the <br /> followi checklist: <br /> Yes 1 ❑ No' I Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visualy inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> Yell; ❑ <br /> ❑ YeNo' Was a racy of system water level readings tested? <br /> Yes ❑ No' Were all probes reinstalled properly? <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how,and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): C Check this box if LLDs are not installed. <br /> Complete the lot Iawing checklist: <br /> X Yes No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> N/A that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> X Yes - No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes No' Was the testing apparatus properly calibrated? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> X WA <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> WA <br /> x Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> WA disconnected? <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails <br /> WA a test? <br /> X Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> I WA <br /> X Yes No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: THIS MONITOR CERT WAS DONE AS PART OF A SOFTWARE UPGRADE FOR C A R B COMPLIANCE <br /> REQURIM NT _— <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 <br /> 2/21/07 <br />