My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging f SIR Equipment X Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com the <br /> followi checklist: <br /> Yes 1 ❑ No' I Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visualy inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> Yell; ❑ <br /> ❑ YeNo' Was a racy of system water level readings tested? <br /> Yes ❑ No' Were all probes reinstalled properly? <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how,and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): C Check this box if LLDs are not installed. <br /> Complete the lot Iawing checklist: <br /> X Yes No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> N/A that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> X Yes - No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes No' Was the testing apparatus properly calibrated? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> X WA <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> WA <br /> x Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> WA disconnected? <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails <br /> WA a test? <br /> X Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> I WA <br /> X Yes No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: THIS MONITOR CERT WAS DONE AS PART OF A SOFTWARE UPGRADE FOR C A R B COMPLIANCE <br /> REQURIM NT _— <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 <br /> 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.